Difference between revisions of "Hyp-StraMeeting 20220407"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
==Info==
 
==Info==
* 21:00- on Apr 7, 2022 (JST)
+
* 21:00-22:00 on Apr 7, 2022 (JST)
*  
+
* Nue, Joerg, Pete, Franco, Guido, Sho, Toshi
 
* via Zoom
 
* via Zoom
 
  
 
==Discussion==
 
==Discussion==
Line 19: Line 18:
 
===ERR===  
 
===ERR===  
 
*PCS
 
*PCS
** Sometime in this summer.  
+
** Aiming at Aug-Oct.  
  
 
*Target   
 
*Target   
 
** Target meeting on Apr 4th with Dave (Toshi)
 
** Target meeting on Apr 4th with Dave (Toshi)
 
** ERR in Jan-Feb 2023 → detail design / construction → Experiment in 2025
 
** ERR in Jan-Feb 2023 → detail design / construction → Experiment in 2025
** We may need to talk with Mark for manpower arrangement. 
 
  
==Report==
+
==References==
=Next Meeting=
+
* About Pb target
 +
**[https://wiki.jlab.org/tegwiki/images/5/5d/Nagao_20211207.pdf Sho's slide in the collaboration meeting 2021] (p. 15)
 +
**[[hyp-StraMeeting_20211007|Toshi's slide in the strategy meeting (Oct 07, 2021)]] (p. 2)
 +
** [[HYP_Pb-exp_20211004|Toshi's slide for the meeting on Oct 04, 2021]] (p. 4)
 +
**[https://hallcweb.jlab.org/wiki/index.php/Hall_C_Futures Hall C future meeting] ([https://www-nh.scphys.kyoto-u.ac.jp/~gogami/temp/NextHypernuclear_JLabHallC_gogami_20210701.pdf another link to the slide]) (July 1, 2021)
  
 
<br><br>
 
<br><br>
 
<hr>
 
<hr>
 
<font size="4">[[HYP_HRS-HKS | Back to Home (Hypernuclear project with HRS-HKS)]]</font>
 
<font size="4">[[HYP_HRS-HKS | Back to Home (Hypernuclear project with HRS-HKS)]]</font>

Latest revision as of 10:10, 7 April 2022

Strategy Meeting (JLab Hypernuclear Epxeriment)

Info

  • 21:00-22:00 on Apr 7, 2022 (JST)
  • Nue, Joerg, Pete, Franco, Guido, Sho, Toshi
  • via Zoom

Discussion

Decision of the experimental hall

  • HKS + vertical HES in Hall C
    • Possible beam time is in 2025.
    • We will decide the experimental hall in the next strategy meeting,
      checking the possibility of Pb target.
    • We will send a request of technical support by JLab
      once we decide the hall.

Document to PAC this year?

  • Let's summarize the updates at least.

ERR

  • PCS
    • Aiming at Aug-Oct.
  • Target
    • Target meeting on Apr 4th with Dave (Toshi)
    • ERR in Jan-Feb 2023 → detail design / construction → Experiment in 2025

References




Back to Home (Hypernuclear project with HRS-HKS)