Difference between revisions of "HYP-meeting 20220602"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
* Efficiency | * Efficiency | ||
− | ** About 90%. <br> How much is the inefficiency if two layers are required out of three layers? | + | ** About 90% for one PMT. <br> How much is the inefficiency if two layers are required out of three layers? |
* Channel was converted into NPE. | * Channel was converted into NPE. |
Revision as of 00:20, 2 June 2022
Information
- 9:30-11:20 on Jun 02, 2022 JST (8:30-10:20 on Jun 01, 2022 EDT)
- Bishnu (Hampton Univ.), Toshi (Kyoto Univ.)
Discussion
AC test at ESB
→ PDF file
- TDC cut for scintillators
- Current condition: "TDC cut on each TDC → TOF"
→ TG suggested to apply only TOF cut.
- Current condition: "TDC cut on each TDC → TOF"
- We found that an ADC of PMTs of scintillators has only pedestal
→ will be checked.- Note that the trigger condition is 2 hits out of 4 PMTs.
→ That's why there are pedestals in all ADCs of scintillators.
- Note that the trigger condition is 2 hits out of 4 PMTs.
- Efficiency
- About 90% for one PMT.
How much is the inefficiency if two layers are required out of three layers?
- About 90% for one PMT.
- Channel was converted into NPE.
Next Meeting
- 9:00 p.m. - on June 10, 2022, JST
(8:00 a.m.- on June 9, 2022, EST)