Difference between revisions of "HYP-meeting 20220602"
Jump to navigation
Jump to search
(10 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
=Discussion= | =Discussion= | ||
− | ==AC | + | ==AC test at ESB== |
+ | → <font size="4"> [[Media:JLabMeeting 20220601 Bishnu.pdf|PDF file]]</font> | ||
* TDC cut for scintillators | * TDC cut for scintillators | ||
− | ** "TDC cut on each TDC → TOF" <br> TG suggested to apply only TOF cut. | + | ** Current condition: "TDC cut on each TDC → TOF cut" <br>→ TG suggested to apply only the TOF cut. |
* We found that an ADC of PMTs of scintillators has only pedestal <br> → will be checked. | * We found that an ADC of PMTs of scintillators has only pedestal <br> → will be checked. | ||
** Note that the trigger condition is 2 hits out of 4 PMTs. <br> → That's why there are pedestals in all ADCs of scintillators. | ** Note that the trigger condition is 2 hits out of 4 PMTs. <br> → That's why there are pedestals in all ADCs of scintillators. | ||
+ | |||
+ | * Efficiency | ||
+ | ** About 90% for one PMT. <br> How much is the inefficiency if two layers are required out of three layers? | ||
* Channel was converted into NPE. | * Channel was converted into NPE. | ||
− | ** | + | ** ADC sum of two PMTs <br> → NPE ~ 9 which is consistent with the results obtained a few years ago. <br> [[File:Plot 20220602.PNG |500px]] |
− | == | + | =Next Meeting= |
+ | * 9:00 p.m. - on June 10, 2022, JST<br> (8:00 a.m.- on June 9, 2022, EST) | ||
+ | <br> | ||
+ | ----- | ||
+ | <font size="4"> [[HYP_HRS-HKS|Back to Home]]</font> |
Latest revision as of 00:27, 2 June 2022
Information
- 9:30-11:20 on Jun 02, 2022 JST (8:30-10:20 on Jun 01, 2022 EDT)
- Bishnu (Hampton Univ.), Toshi (Kyoto Univ.)
Discussion
AC test at ESB
→ PDF file
- TDC cut for scintillators
- Current condition: "TDC cut on each TDC → TOF cut"
→ TG suggested to apply only the TOF cut.
- Current condition: "TDC cut on each TDC → TOF cut"
- We found that an ADC of PMTs of scintillators has only pedestal
→ will be checked.- Note that the trigger condition is 2 hits out of 4 PMTs.
→ That's why there are pedestals in all ADCs of scintillators.
- Note that the trigger condition is 2 hits out of 4 PMTs.
- Efficiency
- About 90% for one PMT.
How much is the inefficiency if two layers are required out of three layers?
- About 90% for one PMT.
- Channel was converted into NPE.
Next Meeting
- 9:00 p.m. - on June 10, 2022, JST
(8:00 a.m.- on June 9, 2022, EST)