Difference between revisions of "HYP-meeting 20220602"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(9 intermediate revisions by the same user not shown)
Line 5: Line 5:
  
 
=Discussion=
 
=Discussion=
==AC commissioning==
+
==AC test at ESB==
 +
 &rarr; <font size="4"> [[Media:JLabMeeting 20220601 Bishnu.pdf|PDF file]]</font>
 
* TDC cut for scintillators  
 
* TDC cut for scintillators  
** "TDC cut on each TDC &rarr; TOF" <br> TG suggested to apply only TOF cut.  
+
** Current condition: "TDC cut on each TDC &rarr; TOF cut" <br>&rarr;  TG suggested to apply only the TOF cut.  
  
 
* We found that an ADC of PMTs of scintillators has only pedestal <br> &rarr; will be checked.  
 
* We found that an ADC of PMTs of scintillators has only pedestal <br> &rarr; will be checked.  
 
** Note that the trigger condition is 2 hits out of 4 PMTs. <br> &rarr; That's why there are pedestals in all ADCs of scintillators.  
 
** Note that the trigger condition is 2 hits out of 4 PMTs. <br> &rarr; That's why there are pedestals in all ADCs of scintillators.  
 +
 +
* Efficiency
 +
** About 90% for one PMT. <br> How much is the inefficiency if two layers are required out of three layers?
  
 
* Channel was converted into NPE.
 
* Channel was converted into NPE.
** ADC sum of Two PMTs <br> &rarr; NPE ~ 9 which is consistent with the results obtained a few years ago.
+
** ADC sum of two PMTs <br> &rarr; NPE ~ 9 which is consistent with the results obtained a few years ago. <br> [[File:Plot 20220602.PNG |500px]]
  
==Detector commissioning==
+
=Next Meeting=
 +
* 9:00 p.m. - on June 10, 2022, JST<br> (8:00 a.m.- on June 9, 2022, EST)
 +
<br>
 +
-----
 +
<font size="4"> [[HYP_HRS-HKS|Back to Home]]</font>

Latest revision as of 00:27, 2 June 2022

Information

  • 9:30-11:20 on Jun 02, 2022 JST (8:30-10:20 on Jun 01, 2022 EDT)
  • Bishnu (Hampton Univ.), Toshi (Kyoto Univ.)


Discussion

AC test at ESB

 → PDF file

  • TDC cut for scintillators
    • Current condition: "TDC cut on each TDC → TOF cut"
      → TG suggested to apply only the TOF cut.
  • We found that an ADC of PMTs of scintillators has only pedestal
    → will be checked.
    • Note that the trigger condition is 2 hits out of 4 PMTs.
      → That's why there are pedestals in all ADCs of scintillators.
  • Efficiency
    • About 90% for one PMT.
      How much is the inefficiency if two layers are required out of three layers?
  • Channel was converted into NPE.
    • ADC sum of two PMTs
      → NPE ~ 9 which is consistent with the results obtained a few years ago.
      Plot 20220602.PNG

Next Meeting

  • 9:00 p.m. - on June 10, 2022, JST
    (8:00 a.m.- on June 9, 2022, EST)



Back to Home