Difference between revisions of "Hyp-StraMeeting 20241016"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(12 intermediate revisions by the same user not shown)
Line 21: Line 21:
 
** CH<sub>2</sub> target <br>&rarr; Detail needs to be determined. (need to be separate?)
 
** CH<sub>2</sub> target <br>&rarr; Detail needs to be determined. (need to be separate?)
 
*In addition to corrector magnet, steel shields are consider to be added on the beam line.
 
*In addition to corrector magnet, steel shields are consider to be added on the beam line.
 +
* Shielding blocks
 +
** No response from the vender
 +
** Were there shielding blocks for HES detectors at lower part of dipole magnet?
 +
* Cables for electronics
 +
** The cables from all spectrometers go to SHMS because there will be space.
 +
*Collaboration Meeting should be held after the ERR
 +
 +
===Lead target simulation (Guido)===
 +
* Guido got a heat simulation result from Silviu, and Guido showed us the result.<br> &rarr; [[Media:Pb-target-for-ERR 14oct2024draft (1).docx|word]]
 +
 +
===ESAD for E05-115===
 +
File from Joerg &rarr; [[Media:ESAD.pdf|ESAD_E05-115.pdf]]
  
 
===Others===
 
===Others===
  
 
==Next Meeting==
 
==Next Meeting==
* 22:00 on Oct 16, 2024 (JST)  
+
* 22:00 on Oct 23, 2024 (JST)  
  
  

Latest revision as of 10:25, 16 October 2024

Strategy Meeting on Oct 16, 2024

Information

  • Time and Date: 22:00-23:00 on Oct 16, 2024 (JST)
  • Participants: Gudio, Nue, Pete, Joerg, Toshi
  • Place: Zoom

Content

ERR

  • Status of the document
    https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit?tab=t.0
  • Agenda
    https://hallcweb.jlab.org/wiki/index.php/ERR_Hypernuclear
  • Target (Liguang talked with Dave Meekins)
    • No manpower is available at the moment to initiate something.
    • (e,e'K+) target design should be straightforward.
    • α source mounting may be an issue to consider.
    • Liguang also talked with Radcon to proceed with buying the α source
    • Mixed α source (1 kBq for each)
      • The source may have a issue under low temperature.
      • Vacuum condition is OK.
    • 20 inch diameter for the scattering chamber.
    • CH2 target
      → Detail needs to be determined. (need to be separate?)
  • In addition to corrector magnet, steel shields are consider to be added on the beam line.
  • Shielding blocks
    • No response from the vender
    • Were there shielding blocks for HES detectors at lower part of dipole magnet?
  • Cables for electronics
    • The cables from all spectrometers go to SHMS because there will be space.
  • Collaboration Meeting should be held after the ERR

Lead target simulation (Guido)

  • Guido got a heat simulation result from Silviu, and Guido showed us the result.
    word

ESAD for E05-115

File from Joerg → ESAD_E05-115.pdf

Others

Next Meeting

  • 22:00 on Oct 23, 2024 (JST)



Back to Home