** No response from the vender | ** No response from the vender | ||
** Were there shielding blocks for HES detectors at lower part of dipole magnet? | ** Were there shielding blocks for HES detectors at lower part of dipole magnet? | ||
+ | * Cables for electronics | ||
+ | ** The cables from all spectrometers go to SHMS because there will be space. | ||
+ | *Collaboration Meeting should be held after the ERR | ||
+ | |||
+ | ===Lead target simulation (Guido)=== | ||
+ | * Guido got a heat simulation result from Silviu, and Guido showed us the result.<br> → [[Media:Pb-target-for-ERR 14oct2024draft (1).docx|word]] | ||
+ | |||
+ | ===ESAD for E05-115=== | ||
+ | File from Joerg → [[Media:ESAD.pdf|ESAD_E05-115.pdf]] | ||
===Others=== | ===Others=== | ||
==Next Meeting== | ==Next Meeting== | ||
− | * 22:00 on Oct | + | * 22:00 on Oct 23, 2024 (JST) |
Latest revision as of 10:25, 16 October 2024
Strategy Meeting on Oct 16, 2024
Information
- Time and Date: 22:00-23:00 on Oct 16, 2024 (JST)
- Participants: Gudio, Nue, Pete, Joerg, Toshi
- Place: Zoom
Content
ERR
- Status of the document
→ https://docs.google.com/document/d/1HHiisnoN5jbF99KLEU4m0DJAT5dRWxFvhk0N4QuPV1Y/edit?tab=t.0 - Agenda
→ https://hallcweb.jlab.org/wiki/index.php/ERR_Hypernuclear - Target (Liguang talked with Dave Meekins)
- No manpower is available at the moment to initiate something.
- (e,e'K+) target design should be straightforward.
- α source mounting may be an issue to consider.
- Liguang also talked with Radcon to proceed with buying the α source
- Mixed α source (1 kBq for each)
- The source may have a issue under low temperature.
- Vacuum condition is OK.
- 20 inch diameter for the scattering chamber.
- CH2 target
→ Detail needs to be determined. (need to be separate?)
- In addition to corrector magnet, steel shields are consider to be added on the beam line.
- Shielding blocks
- No response from the vender
- Were there shielding blocks for HES detectors at lower part of dipole magnet?
- Cables for electronics
- The cables from all spectrometers go to SHMS because there will be space.
- Collaboration Meeting should be held after the ERR
Lead target simulation (Guido)
- Guido got a heat simulation result from Silviu, and Guido showed us the result.
→ word
ESAD for E05-115
File from Joerg → ESAD_E05-115.pdf
Others
Next Meeting
- 22:00 on Oct 23, 2024 (JST)