Difference between revisions of "Hyp-StraMeeting 20220203"
Jump to navigation
Jump to search
(→Report) |
(→Report) |
||
Line 25: | Line 25: | ||
* Information to share | * Information to share | ||
** PCS status | ** PCS status | ||
− | *** Feb 6 (Newport News) | + | *** Feb 6 (Newport News) |
+ | *** will be unloaded in ESB | ||
** Hall A / C simulation (Tohoku) | ** Hall A / C simulation (Tohoku) | ||
Revision as of 09:05, 3 February 2022
Strategy Meeting
Info
- 21:00- on Feb 03, 2022 (JST)
- Franco, Mark, Nue, Liguang, Guido, Joerg, Pete, Sho, Gogami
- via Zoom
Discussion (1)
- Possibility of HKS in Hall C (c.f. Collaboration Meeting 2021)
- Kinematics difference between Hall A and C.
Larger energy in Hall A which leads to a better S/N, but worse resolution. - Three cases are being studied, A: PCS+HKS+SHMS, B: PCS+HKS+HES, C: SPL+HKS+HES.
→ Solid angle / momentum resolution were shown after Q strength were adjusted for the B and C option.
- Kinematics difference between Hall A and C.
- Beam time
- When ?
→ Could be in 2026~ even in Hall C. - Moller 2024. SBS is being tried to be done before that.
→ HKS would be in 2029~ in the case of Hall A. - Could HRS-HRS (hyper) be jumped in (in 2024? for example)?
→ HRS-HKS could take a similar time to install. - Can be longer ?
- When ?
→ 1. HRS-HKS in Hall A (2024?), 2. XXX-HKS in Hall C (2026~), 3. quick HRS-HRS(HKS) experiment (+ α later) in Hall A
- PAC
Report
- Information to share
- PCS status
- Feb 6 (Newport News)
- will be unloaded in ESB
- Hall A / C simulation (Tohoku)
- PCS status
Discussion (2)
- Paper draft (nnΛ)
- Presentations in Hall A Winter Collaboration meeting
- Toshi: nnΛ
- Guido: HKS