Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
</ol> | </ol> | ||
− | <li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] ( | + | <li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (standard) |
<ol> | <ol> | ||
<li> [[Fall-2018 SRC DAQ and Trigger Checkout]] | <li> [[Fall-2018 SRC DAQ and Trigger Checkout]] | ||
Line 25: | Line 25: | ||
</ol> | </ol> | ||
− | <li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] ( | + | <li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] (standard) |
<ol> | <ol> | ||
<li> [[Fall-2018Aerogel Cherenkov Detector Checkout]] | <li> [[Fall-2018Aerogel Cherenkov Detector Checkout]] | ||
<li> [[Fall-2018Gas Cherenkov Detector Checkout]] | <li> [[Fall-2018Gas Cherenkov Detector Checkout]] | ||
</ol> | </ol> | ||
− | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) ( | + | |
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) (standard) | ||
<ol> | <ol> | ||
<li> [[Fall-2018Aerogel Cherenkov Detector Calibration]] | <li> [[Fall-2018Aerogel Cherenkov Detector Calibration]] |
Revision as of 14:14, 21 September 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
New Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering (standard)
- Raster Size Calibration (standard)
- ARC Energy Measurement (standard, parasitic only)
- Fall-2018 BPM Calibration (See Spring2018 BPM Calibration) (pedestal run, Bullseye scan)
- DAQ and Trigger Checkout (standard)
- Detector Checkout / Optics (standard)
- Detector Calibrations (in parallel with other activities once we have the electron data) (standard)
- Fall-2018 Target Boiling Study