Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
Line 16: | Line 16: | ||
<li> [[Raster Size Calibration]] (standard) | <li> [[Raster Size Calibration]] (standard) | ||
<li> [[ARC Energy Measurement]] (standard, parasitic only) | <li> [[ARC Energy Measurement]] (standard, parasitic only) | ||
− | <li> [[Fall-2018 BPM Calibration]] [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration | + | <li> [[Fall-2018 BPM Calibration]] (pedestal run, Bullseye scan, [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration]) |
</ol> | </ol> | ||
Revision as of 14:15, 21 September 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
New Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering (standard)
- Raster Size Calibration (standard)
- ARC Energy Measurement (standard, parasitic only)
- Fall-2018 BPM Calibration (pedestal run, Bullseye scan, See Spring2018 BPM Calibration)
- DAQ and Trigger Checkout (standard)
- Detector Checkout / Optics (standard)
- Detector Calibrations (in parallel with other activities once we have the electron data) (standard)
- Fall-2018 Target Boiling Study