Difference between revisions of "Hyp-StraMeeting 20220203"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
** Three cases are being studied, A: PCS+HKS+SHMS, B: PCS+HKS+HES, C: SPL+HKS+HES. <br> → Solid angle / momentum resolution were shown after Q strength were adjusted for the B and C option. | ** Three cases are being studied, A: PCS+HKS+SHMS, B: PCS+HKS+HES, C: SPL+HKS+HES. <br> → Solid angle / momentum resolution were shown after Q strength were adjusted for the B and C option. | ||
− | * Beam time | + | * Beam time |
** When ? <br> → Could be in 2026~ even in Hall C. | ** When ? <br> → Could be in 2026~ even in Hall C. | ||
+ | ** Moller 2024. SBS is tried to be done before that. <br> → HKS would be in 2029~ in the case of Hall A. | ||
** Can be longer ? | ** Can be longer ? | ||
Revision as of 08:35, 3 February 2022
Strategy Meeting
Info
- 21:00- on Feb 03, 2022 (JST)
- Franco, Mark, Nue, Liguang, Guido, Joerg, Pete, Sho, Gogami
- via Zoom
Discussion (1)
- Possibility of HKS in Hall C (c.f. Collaboration Meeting 2021)
- Kinematics difference between Hall A and C.
Larger energy in Hall A which leads to a better S/N, but worse resolution. - Three cases are being studied, A: PCS+HKS+SHMS, B: PCS+HKS+HES, C: SPL+HKS+HES.
→ Solid angle / momentum resolution were shown after Q strength were adjusted for the B and C option.
- Kinematics difference between Hall A and C.
- Beam time
- When ?
→ Could be in 2026~ even in Hall C. - Moller 2024. SBS is tried to be done before that.
→ HKS would be in 2029~ in the case of Hall A. - Can be longer ?
- When ?
- PAC
Report
- Information to share
- PCS status
- Hall A / C simulation (Tohoku)
Discussion (2)
- Paper draft (nnΛ)
- Presentations in Hall A Winter Collaboration meeting
- Toshi: nnΛ
- Guido: HKS