Installation and Commissioning
Back to 2017 Fall Run Plan Back to Tritium-Main
Installation and Configuration
Before Beam
- Trigger Timing Checkout (placeholder slides)
- HRS Detector Checkout
- Beamline
- Spectrometer Angles
- Magnets
- DAQ
- Software
With First Beam
- Beamline
- Beam Centering
- Raster Size Calibration
- BPM Calibration (pedestal run, Bullseye scan)
- BCM Calibration
- ARC Energy Measurement (parasitic only)
- Trigger Timing Checkout
- Detector Checkout with single foil, multi foils, and target cells
- HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?)
- Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell
- Detector Calibrations (in parallel with other activities once we have the electron data)
Optics commissioning runs
Target Boiling Study
- H3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
H3 | 25uA | 2x2 cm | |||||
H3 | 15uA | 2x2 cm | |||||
H3 | 5uA | 2x2 cm |
- He3 Target
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
He3 | 25uA | 2x2 cm | |||||
He3 | 15uA | 2x2 mm | |||||
He3 | 5uA | 2x2 cm |
- C12 target for a normalization check for beam-current dependent rate check.
Run number | Target | Beam Current | Raster Size | Ebeam [GeV] | P0 [GeV/c] | θe [deg] | Comment |
Carbon-Foil | 25uA | 2x2 mm | |||||
Carbon-Foil | 15uA | 2x2 mm | |||||
Carbon-Foil | 5uA | 2x2 mm |
Beam Energy Measurements
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |