Difference between revisions of "File:LHRS maps mar17.pdf"

From Tritium Experiments Group
Jump to navigation Jump to search
(Hauenst uploaded a new version of File:LHRS maps mar17.pdf)
(Hauenst uploaded a new version of File:LHRS maps mar17.pdf)
 
(No difference)

Latest revision as of 14:51, 2 December 2017

Overview over cable connections in the right electronic rack on the LHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tritium run in fall17/spring18. Plots done by Mike Nycz

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current14:51, 2 December 2017 (97 KB)Hauenst (talk | contribs)Reverted to version as of 21:00, 1 July 2017, Updated file was wrong
14:46, 2 December 2017 (125 KB)Hauenst (talk | contribs)Updates for some PRL channels. Current Version from end of November.
17:00, 1 July 2017 (97 KB)Hauenst (talk | contribs)Overview over cable connections in the right electronic rack on the LHRS after the Argon beam time in spring 2017 and before the tritium setup. The connections include TS, TM, Retiming cables as well as all NIM modules. The setup will be cleaned for tr...

There are no pages that use this file.