Line 8: Line 8:
 
* To ERR
 
* To ERR
 
** We set a target to arrange ERR in October 2022.  
 
** We set a target to arrange ERR in October 2022.  
** Scattering chamber,
 
  
* Basic information check
+
* Basic information check / Discussion
 
** Gas target (<sup>3,4</sup>He, H<sub>2</sub>)
 
** Gas target (<sup>3,4</sup>He, H<sub>2</sub>)
 
*** H<sub>2</sub> target cell needs to be a little bit larger that that of helium targets.  
 
*** H<sub>2</sub> target cell needs to be a little bit larger that that of helium targets.  
Line 16: Line 15:
 
** Solid targets
 
** Solid targets
 
*** Multi-target configuration for each target is being considered in the case of Hall A option.<br> &rarr; The multi targets seems to be very difficult in the case of Hall C because of poor S/N.   
 
*** Multi-target configuration for each target is being considered in the case of Hall A option.<br> &rarr; The multi targets seems to be very difficult in the case of Hall C because of poor S/N.   
 +
** Ladder
 +
*** horizontal insertion is much harder that vertical one. <br> &rarr; Let's decide to consider only vertical option.
 +
* Scattering chamber <br> &rarr; new one that is dedicated for the present experiment is needed. 
  
 
* Next work
 
* Next work

Revision as of 20:27, 14 October 2021

Target Meeting (HRS-HKS experiment at JLab Hall A)

  • 21:00- on October 12th, 2021 EDT (10:00- on October 13, 2021 JST)
  • Participants: David Meekins (JLab), Toshiyuki Gogami (Kyoto Univ.)
  • via BlueJeans


Discussion

  • To ERR
    • We set a target to arrange ERR in October 2022.
  • Basic information check / Discussion
    • Gas target (3,4He, H2)
      • H2 target cell needs to be a little bit larger that that of helium targets.
    • Optics target (5 carbon foils)
    • Solid targets
      • Multi-target configuration for each target is being considered in the case of Hall A option.
        → The multi targets seems to be very difficult in the case of Hall C because of poor S/N.
    • Ladder
      • horizontal insertion is much harder that vertical one.
        → Let's decide to consider only vertical option.
  • Scattering chamber
    → new one that is dedicated for the present experiment is needed.
  • Next work
    • Dave is giving CREX/PREX target drawing to Toshi
      We will start concrete design with this.
      → Toshi will work on 3D CAD drawings.
    • Dave is going to





Back to home