Difference between revisions of "HYP Target Meeting 20231030"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 8: Line 8:
 
[[Media:HKS-target meeting gogami 20231030.pdf|HKS-target_meeting_gogami_20231030.pdf]]</font>
 
[[Media:HKS-target meeting gogami 20231030.pdf|HKS-target_meeting_gogami_20231030.pdf]]</font>
 
==Target list (only solid targets for the next run)==
 
==Target list (only solid targets for the next run)==
Solid targets are planned to be used for the next run. <br> But, the target system would be better to be compatible with gas targets ([https://researchmap.jp/gogami/published_papers/42604225/attachment_file.pdf E12-19-002]).
 
 
=== Approved===  
 
=== Approved===  
 
* E12-15-008: <sup>40</sup>Ca, <sup>48</sup>Ca (150 mg/cm<sup>2</sup>)
 
* E12-15-008: <sup>40</sup>Ca, <sup>48</sup>Ca (150 mg/cm<sup>2</sup>)
Line 22: Line 21:
 
* LOI12-23-016: <sup>27</sup>Al (100 mg/cm<sup>2</sup>)
 
* LOI12-23-016: <sup>27</sup>Al (100 mg/cm<sup>2</sup>)
 
* LOI12-23-011: there may need special needs.   
 
* LOI12-23-011: there may need special needs.   
 +
==Some comments==
 +
* Solid targets are planned to be used for the next run. <br> But, the target system would be better to be compatible with gas targets ([https://researchmap.jp/gogami/published_papers/42604225/attachment_file.pdf E12-19-002]).
 +
* ERR, for example, in Mar is possible for the (solid) target part.
 +
* Requirements for the target (position accuracy etc.) need to be summarized.
 +
* Let's keep using MS Sharepoint for sharing information and documents. 
  
  

Revision as of 17:18, 31 October 2023

Target Meeting (Hypernuclear experiment at JLab)

  • 23:00-24:00 on Oct 29th, 2023 EDT (12:00-13:00 on Oct 30th, 2023 JST)
  • Participants: David Meekins (JLab), Toshiyuki Gogami (Kyoto Univ.)
  • via ZoomGov

Discussion

HKS-target_meeting_gogami_20231030.pdf

Target list (only solid targets for the next run)

Approved

  • E12-15-008: 40Ca, 48Ca (150 mg/cm2)
    • 40 is easy to obtain, but not for 48.
    • Dave asked Oak Ridge National Lab. to purchase the Ca material.
      → no response yet.
      → Dave will contact the Lab.
  • E12-20-013: 208Pb (100-150 mg/cm2)
    • The thickness needs to be fixed for design.
    • Cryogenic system would be needed for cooling.
    • 20 μA would be OK to apply.
  • Common calibration: 12C (150 mg/cm2), CH2 (500 mg/cm2), 27Al (150 mg/cm2)

Proposing next year

  • LOI12-23-013: 6Li, 9Be, 11Be (100 mg/cm2)
  • LOI12-23-016: 27Al (100 mg/cm2)
  • LOI12-23-011: there may need special needs.

Some comments

  • Solid targets are planned to be used for the next run.
    But, the target system would be better to be compatible with gas targets (E12-19-002).
  • ERR, for example, in Mar is possible for the (solid) target part.
  • Requirements for the target (position accuracy etc.) need to be summarized.
  • Let's keep using MS Sharepoint for sharing information and documents.


Next Meeting

13:00 p.m.- on Nov 14, 2022 (EDT) at JLab.
https://indico.jlab.org/event/742/




Back to home