Difference between revisions of "Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 30: Line 30:
 
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
 
<li> [[Detector Checkout with single foil, multi foils, and target cells]]
  
<li> [[HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?)]]
+
<li> [[HRS Optics with saturated Q1]] (LHRS p0>3 GeV, RHRS?)
  
 
<li> [[Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell]]
 
<li> [[Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell]]

Revision as of 19:30, 29 November 2017

Back to 2017 Fall Run Plan Back to Tritium-Main

Installation and Configuration

Before Beam

With First Beam

  1. Beamline
    1. Beam Centering
    2. Raster Size Calibration
    3. BPM Calibration (pedestal run, Bullseye scan)
    4. BCM Calibration
    5. ARC Energy Measurement (parasitic only)
  2. Trigger Timing Checkout
  3. Detector Checkout with single foil, multi foils, and target cells
  4. HRS Optics with saturated Q1 (LHRS p0>3 GeV, RHRS?)
  5. Boiling Study at 17 degree on 3H, 3He, 2H, H targets and empty cell
  6. Detector Calibrations (in parallel with other activities once we have the electron data)

Optics commissioning runs

Target Boiling Study

  • H3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
H3 25uA 2x2 cm
H3 15uA 2x2 cm
H3 5uA 2x2 cm
  • He3 Target
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
He3 25uA 2x2 cm
He3 15uA 2x2 mm
He3 5uA 2x2 cm


  • C12 target for a normalization check for beam-current dependent rate check.
Run number Target Beam Current Raster Size Ebeam [GeV] P0 [GeV/c] θe [deg] Comment
Carbon-Foil 25uA 2x2 mm
Carbon-Foil 15uA 2x2 mm
Carbon-Foil 5uA 2x2 mm

Beam Energy Measurements

Energy of central ray (MeV) Dispersive mode Halog entry
11000.00
4400
2200


Dedicated Commissioning Plans

(ee') SRC (x>1)

MARATHON

(ee'p) SRC

(ee'K) Hypernucleus