Difference between revisions of "Installation and Configuration"

From Tritium Experiments Group
Jump to navigation Jump to search
m
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>]
+
[https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>]
  
 
==Target Info ==
 
==Target Info ==
* Survey, Density, Windows and other Info of the Target
+
* Survey, Density, Windows and other Info of the Target [https://wiki.jlab.org/tegwiki/index.php/Survey_Info,_Density_and_Luminosity_of_Target,_Windows_etc link]
 
* Hall A target gas cell fill pressures and temperatures [https://logbooks.jlab.org/entry/3495700 halog]
 
* Hall A target gas cell fill pressures and temperatures [https://logbooks.jlab.org/entry/3495700 halog]
 
* He3 Certification [https://logbooks.jlab.org/files/2017/11/3490916/He-3%20cert.pdf file]
 
* He3 Certification [https://logbooks.jlab.org/files/2017/11/3490916/He-3%20cert.pdf file]

Latest revision as of 18:51, 13 January 2018

Back to Installation and Commissioning

Target Info

  • Survey, Density, Windows and other Info of the Target link
  • Hall A target gas cell fill pressures and temperatures halog
  • He3 Certification file
  • Hall-A Tritium Target FSD Verification Checklist file

Survey Info

Beam Instrumentation

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link