Difference between revisions of "Installation and Configuration"

From Tritium Experiments Group
Jump to navigation Jump to search
m
 
Line 1: Line 1:
[https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b>Back to Installation and Commissioning</b>]
+
[https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning <b>Back to Installation and Commissioning</b>]
  
 
==Target Info ==
 
==Target Info ==

Latest revision as of 18:51, 13 January 2018

Back to Installation and Commissioning

Target Info

  • Survey, Density, Windows and other Info of the Target link
  • Hall A target gas cell fill pressures and temperatures halog
  • He3 Certification file
  • Hall-A Tritium Target FSD Verification Checklist file

Survey Info

Beam Instrumentation

Spectrometer Angles

  • HRS-L
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link
  • HRS-R
Angle Time Experiment Run Number Ranges Report Comment
17 12/04/2017 SRC xxxx ~ xxxx link