Search results

Jump to navigation Jump to search

Page title matches

  • would be based on a novel bubble-chamber technique, which makes use of the fact that a * <span style="font-size:150%"> '''[[Bubble Chamber Reviews]]''' </span>
    2 KB (286 words) - 10:13, 15 December 2015
  • * Add (tack weld?) fixtures to the vacuum chamber for S&A tooling ...er to S&A for fiducial (locate top flange, and anode flange with repost to chamber z-axis.
    2 KB (326 words) - 12:36, 31 March 2022
  • [[Media:Vacuum Chamber Dimensions.pdf]]
    39 bytes (5 words) - 10:58, 23 September 2015
  • = '''Bubble Chamber Run - May 2018''' = * New procedure for operations, '''''Argonne Bubble Chamber Operations for Engineering Runs''''': [[media:TGT-PROC-18-001.pdf]]
    4 KB (503 words) - 13:06, 8 May 2018
  • 67 bytes (7 words) - 15:41, 2 August 2013
  • [[media:depo chamber for pucks.pdf]] [[media:depo chamber designed by Russ and used by Mamun with stalks.pdf]]
    280 bytes (44 words) - 09:44, 24 October 2016
  • ===Plan to test and choose laser window under vacuum w/ y-chamber=== * vacuum chamber w/ small bread board => '''Marcy/Phil located ready in 1137'''
    1 KB (154 words) - 13:57, 6 October 2020
  • * '''[[Bubble Chamber Beam Test May 2018]]''' * '''[[Bubble Chamber Beam Test August 2016]]'''
    201 bytes (28 words) - 09:41, 2 May 2018
  • 2 KB (388 words) - 09:15, 21 June 2019
  • ...white R30 insulator removed from UITF beam line and replaced with 14" gun chamber + black R28 insulator with Gabriel's T-shape electrode shed design [https:/
    1 KB (135 words) - 15:12, 4 October 2022
  • = '''Bubble Chamber Turn On''' = * '''Fill with natural N<sub>2</sub>O – test bubble chamber systems operation'''
    7 KB (1,106 words) - 11:54, 4 May 2018
  • = '''Bubble Chamber Turn On''' = * '''Fill with natural C<sub>3</sub>F<sub>8</sub> – test bubble chamber systems operation'''
    7 KB (955 words) - 16:24, 20 July 2018
  • * Excel file that models thermodynamics of C<sub>2</sub>F<sub>6</sub> bubble chamber and estimates nucleation thresholds: [[media:ThresholdsC2F6.xlsx]]
    358 bytes (54 words) - 17:00, 2 June 2016
  • ...estimate formula to determine initial setpoint for MDL0L02 into 5D (bubble chamber) line. = '''Bubble Chamber Digital Camera with Beam in Injector''' =
    3 KB (497 words) - 15:37, 11 September 2015
  • ...erson Lab Open House is on Saturday April 30, 2016. There will be a Bubble Chamber display (poster). ...2015. Need to re-submit a new one for approval with addendum of changes to chamber and 100 µA beam current.
    1 KB (175 words) - 11:43, 2 May 2016
  • * Bubble Chamber Run Plan :: Does the Bubble Chamber equipment remain in the machine upon completion of the run this summer?
    2 KB (226 words) - 09:54, 18 May 2018
  • 360 bytes (49 words) - 09:08, 16 July 2019
  • 306 bytes (43 words) - 12:29, 9 February 2021
  • 105 bytes (12 words) - 14:00, 1 September 2022
  • 0 bytes (0 words) - 07:58, 30 March 2017

Page text matches

  • [[media:depo chamber for pucks.pdf]] [[media:depo chamber designed by Russ and used by Mamun with stalks.pdf]]
    280 bytes (44 words) - 09:44, 24 October 2016
  • ...g 14" HV chamber in UITF side-by-side layout comparison with coming 18" HV chamber) #* CEBAF HV chamber centerline is 13-3/4" above table
    661 bytes (88 words) - 07:03, 6 April 2022
  • * Once beam running is over, move the permanent magnet around the HV chamber. Check HV and FE after that to explore the effect on HV. ...it for the new chamber to arrive. Make sure everything is ready to put the chamber together in a very short time.
    1 KB (186 words) - 17:21, 23 August 2016
  • '''Bubble Chamber Checklist''' *Fill chamber with C<sub>2</sub>F<sub>6</sub>
    358 bytes (51 words) - 13:52, 17 September 2015
  • '''Bubble Chamber Checklist''' * Fill chamber with C<sub>2</sub>F<sub>6</sub>
    367 bytes (51 words) - 07:31, 18 September 2015
  • * '''[[Bubble Chamber Beam Test May 2018]]''' * '''[[Bubble Chamber Beam Test August 2016]]'''
    201 bytes (28 words) - 09:41, 2 May 2018
  • * HV chamber * Layouts for installing HV chamber in UITF and in CEBAF
    333 bytes (46 words) - 08:33, 22 March 2022
  • We replaced the original Load Lock Gun (LLGUN) high voltage chamber with a spare INVGUN1 *Here is the work plans [[media:March 2009 – Replaced LLGUN HV chamber with INVGUN HV.docx]]
    184 bytes (30 words) - 16:27, 13 May 2019
  • = Bubble Chamber = * ''Bubble Chamber: Safety and Systems Overview''
    227 bytes (26 words) - 10:59, 5 August 2013
  • :[[gun chamber drawings]] :[[CsK2Sb depo chamber stuff]]
    302 bytes (32 words) - 22:12, 28 March 2018
  • * The Gun HV chamber has been assembled, with the Black R30 inverted ceramic insulator, Yan's sh ...bolted to the cathode prep chamber gate valve. We need to evacuate the gun chamber and leak check the gate valve.
    518 bytes (91 words) - 13:00, 24 October 2016
  • * Marcy or Mamun - Jobs when venting Prep chamber .../status for Mott scattering chamber [[media:201016_200 keV Mott Scattering Chamber Progress.pptx]]
    587 bytes (88 words) - 12:59, 16 October 2020
  • =='''Vacuum Chamber'''==
    161 bytes (18 words) - 09:47, 26 April 2023
  • *[[Media:ACC2003000-0336, LOAD LOCK GUN H.V. CHAMBER U.S. FLANGE, REV-.pdf]] ...Y, REV- apvd.pdf]] This is the flange used in Injector Phase 1 with 18" HV chamber gun
    875 bytes (132 words) - 08:41, 4 May 2022
  • * '''[[Bubble Chamber Meeting Friday August 19, 2022]]''' * '''[[Bubble Chamber Meeting Tuesday August 17, 2021]]'''
    9 KB (1,008 words) - 13:57, 1 September 2022
  • [[April 21, 2022 - HV chamber layout for installation in CEBAF]] [[April 13, 2022 - HV chamber layout for installation in CEBAF]]
    720 bytes (97 words) - 07:33, 22 June 2022
  • ...amber Safety Review: First week of December 2014 - to be able to bring the chamber on site and test it with a source. ...the chamber in the injector and do beam studies with the test beamline and chamber.
    785 bytes (120 words) - 17:50, 22 September 2014
  • ...for high voltage conditioning, and retracted the manipulator into the prep chamber. ...ion pump with valve and several viewports. The rest is blanked off for gun chamber bake
    1 KB (238 words) - 14:48, 3 November 2015
  • 1- Bubble Chamber progress at Argonne * Bubble Chamber:
    921 bytes (134 words) - 17:50, 9 January 2015
  • ===Plan to test and choose laser window under vacuum w/ y-chamber=== * vacuum chamber w/ small bread board => '''Marcy/Phil located ready in 1137'''
    1 KB (154 words) - 13:57, 6 October 2020

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)