  • 1- Injector Upgrade Tasks (Matt Poelker): [[media:Injector_tasks_10_11_23.pdf]] [[media:Injector_tasks_10_11_23.d
    251 bytes (36 words) - 11:27, 3 November 2023
  • [[File:Matt laser.jpeg|thumb|right|350px|alt=Matt Photo.|Matt Poelker checks the laser table]]
    1 KB (162 words) - 12:04, 10 January 2019
  • ...nless Steel. Carlos delivered this material to Vince. Carlos to check with Matt supply chain.
    1,017 bytes (156 words) - 16:25, 26 March 2024
  • ** Matt Poelker: [[media: positron pitch.pptx]]
    736 bytes (98 words) - 10:37, 30 March 2022
  • * Matt Poelker: [[media: positron pitch.pptx]]
    986 bytes (134 words) - 14:12, 15 March 2022
  • ...humb|right|400px|alt=Group Photo.|CIS members are (l to r) Jim Clark, Matt Poelker (Group Leader), Steve Covert, Phil Adderley, Riad Suleiman, John Hansknecht
    1 KB (172 words) - 19:03, 29 May 2014
  • ** Matt' & Joe's positron pitch to management [[media: positron pitch.pptx]] ** Matt Poelker: [[media: positron pitch.pptx]]
    2 KB (240 words) - 07:09, 23 March 2022
  • Matt Poelker UITF introduction [[media:UITF overview_Poelker_final.pptx]] [[media:Poelker notes from UITF internal safety review.docx]]
    2 KB (281 words) - 12:43, 8 July 2016
  • [[media:Matt's final presentation_UITF status.pptx]] *9:15 - 9:55 Status of the UITF - M. Poelker (20+20) (charge #1, 7, 9)
    2 KB (231 words) - 18:45, 22 November 2019
  • I spoke to Cryo and Matt Poelker regarding our plans going forward for testing J11. The following is the agr
    1 KB (194 words) - 14:12, 28 September 2020
  • R. Suleiman and Matt Poelker, JLEIC Collaboration Meeting, Fall 2016. R. Suleiman and Matt Poelker, JLEIC Collaboration Meeting, Spring 2016.
    9 KB (1,292 words) - 14:16, 5 March 2018
  • phase2 ME design meeting minutes 4_22_2021 (Shaun, Gary, Matt and Danny) The MFA solenoid presently attached to back of chopper2 cavity. Poelker inclined to leave as-is, i.e., don't remove it. If we go this route, we st
    2 KB (389 words) - 12:30, 22 April 2021
  • *Poelker to obtain quotes from SAES, including power supplies *Next meeting should include Phil, Marcy, Alicia, Yan and Reza. Matt will distribute the drawings I get from Gary.
    2 KB (400 words) - 14:35, 4 June 2021
  • ** Matt Poelker: [[media: positron pitch.pptx]]
    1 KB (192 words) - 10:53, 16 March 2022
  • * Specify beam line near FCup3 (Matt) # Matt/Camille identify Work Coordinator and Facility Manager for this work. Work
    5 KB (713 words) - 11:15, 14 January 2021
  • Danny, Shaun, Gary, Grames, Marcy, Poelker, Reza, Alicia # Matt get with Neil re: cutting off MFA solenoid
    2 KB (397 words) - 11:51, 14 April 2021
  • ...rames, R. Suleiman, P. A. Adderley, J. Clark, J. Hansknecht, D. Machie, M. Poelker, and M. L. Stutzman, "''Charge and fluence lifetime measurements of a DC hi * Joe Grames, Phil Adderley, John Hansknecht, Reza Kazimi, Matt Poelker, Daniel Moser, Marcy Stutzman, R. Suleiman Shukui Zhang "Milliampere beam s
    3 KB (414 words) - 17:30, 6 December 2019
  • * Poelker to order clean krypton tank and regulator for dedicated gas processing syst * Matt/Danny to submit job to machine shop: spare 200kV shed electrode, tee with m
    2 KB (332 words) - 11:48, 13 December 2017
  • # Curt to estimate the maximum acceleration the buncher can provide, Poelker to summarize buncher in a document. # Matt to provide specifications for UITF PSS BCM, Engineering to design and build
    2 KB (353 words) - 09:50, 22 June 2018
  • ...ry, G. Hays, C. Le Galliard, S. Marsillac, B. Moffit, Thi Nguyen Trung, M. Poelker, R. Suleiman, E. Voutier, S. Zhang, "A Compton transmission polarimeter for ...Wang, Seth M Hubbard, Marcy Stutzman, Joseph Michael Grames, Matt Poelker, Matt Grau, Sylvain Marsillac, "High figure of merit spin polarized electron sour
    25 KB (3,462 words) - 19:19, 11 March 2024