Difference between revisions of "CEBAF Injector Upgrade"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
* '''Feb 1, 2021 - Preliminary songsheet release''' [[media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf]] | * '''Feb 1, 2021 - Preliminary songsheet release''' [[media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf]] | ||
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 '''Link to the''' Phase 1 ATLIS] | * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 '''Link to the''' Phase 1 ATLIS] | ||
+ | |||
+ | [[Phase 1]] | ||
+ | |||
+ | [[Phase 2]] | ||
==Planning, planning, planning...== | ==Planning, planning, planning...== |
Revision as of 11:33, 18 February 2021
The Injector Upgrade wiki begins here.
Quick Links
- Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
- Daily 8:30am toolbox => https://bluejeans.com/171126028
- Monday 1330 SAD Scheduling Meeting => https://bluejeans.com/569476853
- Schedule - updated Jan 25, 2021 w/ Preliminary Commissioning Plan to end of SAD July 2, 2021 media:210125_AIPINJ_Schedule.pdf
- Feb 1, 2021 - Preliminary songsheet release media:210201_PRELIMINARY_ACC0002845-0001, INJECTOR, REV C .pdf
- Link to the Phase 1 ATLIS
Planning, planning, planning...
- CIS Phase 1 work plans
- Phase 1 - HCO & Commissioning
- AIPINJ - Layouts
- AIPINJ - S&A Transmittals
- AIPINJ - Upgrade Meetings
- 3D cad and released drawings on AIPINJ OneDrive Folder
- Long term planning - AIPINJ - Phase 1 and 2 Schedule
- CED nomenclature doc : https://accweb.acc.jlab.org/cnm/codes/system
- CED lookup translator : https://accweb.acc.jlab.org/cnm/translator
Major Phase 1 Beamline Components
- 200 kV gun - Cathode, anode and high voltage system
- 200 kV NEG Coated BPM's - New BPM's on beam pipe, NEG coated and absolutely mapped
- Y-chamber Laser Window - Evaluating the best window to minimize birefringence under stress
- DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
- FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
- PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
- WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
- QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
- Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
- Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
- NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
- HD steering coils - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
- A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
- Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
- Beamline viewers
- LLRF 3.0 Phase 1
Major Phase 2 Beamline Components
ATLIS Tasks
- AIPINJ
- Injector Wien Filter - system upgrade (2020 SAD)
- Removal of PSS kicker magnet injector segment
- Mat'l Handling and Installation for Phase I of Inj. Upgrade
- Pedestal Location Surveys
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
- Testing Wien HV Controls at UITF
- Perform Installation work for newly added Injector bpm during 2020 SAD
- IOCSE11 & IOCINSE4 BPM Controls Update
- Install and Commission Wien filter Power Supplies
- Install PSS jumpers for laser work at the Injector
- CIS SAD Tasks
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
- Fix IHWP readback during SAD
- Injector Related SAD Tasks
- Install and Commission Wien filter Power Supplies] (magnet PS)
- Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]
- PSS Injector Interface Chassis removal
- PSS Injector Segment PLC Upgrade
- PSS Injector Interface Chassis removal
- PSS CAMAC Relay cards replacement with VME versions for Injector and BSY
- I&C Injector Camac to Vme and camera upgrade
- I&C Upgrade harps to PC104
- I&C Upgrade existing ItoV System with ItoV VME cards
- I&C Accelerator network re-survey
- FAC Tunnel Fire Alarm and Suppression Replacement
- Apply labels to I&C components during 2020 SAD
- Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ
- Neutron Detector System Installation (SAD 2020)
- UHV Power Supply Replacement (ISB)
- Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version
- Trim Utility Chassis Upgrade - All CEBAF Trim Racks
- SAD 2020: P.M. of 24V Vacuum Power Supply Chassis
- VME crate upgrade to IOCIN3
- Remove old Sonitrol system hardware from NA and SA
- Shutdown of Panel I-BT in the Injector
- Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b)