Line 28: Line 28:
  
 
;AIPINJ
 
;AIPINJ
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)]
* '''Ongoing''' perhaps complete [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update]
+
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
+
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21570 Install PSS jumpers for laser work at the Injector]
+
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21922 Relocate Recepacles Downstairs in Injector Bldg.53]
+
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21570 Install PSS jumpers for laser work at the Injector]
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21922 Relocate Recepacles Downstairs in Injector Bldg.53]
  
 
;CIS SAD Tasks
 
;CIS SAD Tasks

Revision as of 19:06, 5 March 2021

Quick Phase 1 Links

ATLIS => Phase 1 ATLIS
8:30 Tools => CIS Phase 1 work plans
HCO => Phase 1 - HCO & Commissioning
Meetings=> AIPINJ - Upgrade Meetings
Schedule Status => media:210125_AIPINJ_Schedule.pdf

Major Phase 1 Beamline Components

200 kV gun - Cathode, anode and high voltage system
200 kV NEG Coated BPM's - New BPM's on beam pipe, NEG coated and absolutely mapped
Y-chamber Laser Window - Evaluating the best window to minimize birefringence under stress
DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
HD steering coils - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
Beamline viewers
LLRF 3.0 Phase 1

ATLIS Tasks

AIPINJ
CIS SAD Tasks
Injector Related SAD Tasks