Difference between revisions of "A1/A2 Aperture Steering Cubes"
Jump to navigation
Jump to search
(Created page with "The A1 and A2 apertures define injector acceptance into the chopping system, additionally the A2 aperture is the beam stopper for the PSS kicker. ; HD steering coils ; A1 mo...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
The A1 and A2 apertures define injector acceptance into the chopping system, additionally the A2 aperture is the beam stopper for the PSS kicker. | The A1 and A2 apertures define injector acceptance into the chopping system, additionally the A2 aperture is the beam stopper for the PSS kicker. | ||
− | ; HD steering coils | + | ; New [[HD steering coils]] |
+ | |||
+ | ; A1 & A2 aperture alignment and spacer values (Jan 05, 2021) | ||
+ | : A1 (2,3,4 mm) & stepper controls [[media:210105_report_A1.xlsx]] | ||
+ | : A2 (4,6,8 mm) [[media:210105_report_A2.xlsx]] | ||
; A1 motorized aperture | ; A1 motorized aperture | ||
Line 11: | Line 15: | ||
:Stac5 Quick Setup Guide [[media:STAC5_QuickSetup_Guide.pdf]] | :Stac5 Quick Setup Guide [[media:STAC5_QuickSetup_Guide.pdf]] | ||
:Stac5 Limit Switch Pinout [[media:STAC5_Limit_Switches.docx]] | :Stac5 Limit Switch Pinout [[media:STAC5_Limit_Switches.docx]] | ||
+ | |||
+ | ; Aperture assembly instructions from Danny | ||
+ | *a note to phil and marcy, on the real assembly work, the bottom and right side of the cube are no problem to assemble. | ||
+ | *the left side (ion pump) will need studs. | ||
+ | *the top (with the actuator) requires a proper sequence. it might be easier to assemble it upside down. | ||
+ | *basically: | ||
+ | #pre-load bolts into cube tube CF flange. | ||
+ | #put on magnet (with no 4.5 dummy flange) and push it against cube face. | ||
+ | #bolt on actuator. | ||
+ | #move magnet against acutator. | ||
+ | #bolt in dummy 4.5 flange spacer. | ||
+ | #bolt magnet to dummy flange. |
Latest revision as of 14:29, 14 June 2021
The A1 and A2 apertures define injector acceptance into the chopping system, additionally the A2 aperture is the beam stopper for the PSS kicker.
- A1 & A2 aperture alignment and spacer values (Jan 05, 2021)
- A1 (2,3,4 mm) & stepper controls media:210105_report_A1.xlsx
- A2 (4,6,8 mm) media:210105_report_A2.xlsx
- A1 motorized aperture
- VacGen Motor Driven SLTM Series media: VacGen_LTM_Series_Operating_Instructions.pdf
- VacGen Motor Handbook media: Motor_operating_handbook_14.pdf
- VacGen Motor to Stac5 Wiring media: VacGen_motor.pdf
- Stac5 to Motor Encoder Pinout media: Encoder_pinout.pdf
- Stac5 Hardware Manual media:STAC5_Hardware_Manual.pdf
- Stac5 Quick Setup Guide media:STAC5_QuickSetup_Guide.pdf
- Stac5 Limit Switch Pinout media:STAC5_Limit_Switches.docx
- Aperture assembly instructions from Danny
- a note to phil and marcy, on the real assembly work, the bottom and right side of the cube are no problem to assemble.
- the left side (ion pump) will need studs.
- the top (with the actuator) requires a proper sequence. it might be easier to assemble it upside down.
- basically:
- pre-load bolts into cube tube CF flange.
- put on magnet (with no 4.5 dummy flange) and push it against cube face.
- bolt on actuator.
- move magnet against acutator.
- bolt in dummy 4.5 flange spacer.
- bolt magnet to dummy flange.