Phase 1
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Quick Phase 1 Links
- ATLIS => Phase 1 ATLIS
- TOOLBOX => CIS Phase 1 work plans
- HCO => Phase 1 - HCO & Commissioning
- MEETING => AIPINJ - Upgrade Meetings
- SCHEDULE => media:210125_AIPINJ_Schedule.pdf
Major Phase 1 Beamline Components
- 200 kV gun - Cathode, anode and high voltage system
- 200 kV NEG Coated BPM's - New BPM's on beam pipe, NEG coated and absolutely mapped
- Y-chamber Laser Window - Evaluating the best window to minimize birefringence under stress
- DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
- FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
- PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
- WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
- QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
- Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
- Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
- NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
- HD steering coils - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
- A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
- Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
- Beamline viewers
- LLRF 3.0 Phase 1
ATLIS Tasks
- AIPINJ
- Injector Wien Filter - system upgrade (2020 SAD)
- Ongoing perhaps complete Removal of PSS kicker magnet injector segment
- Mat'l Handling and Installation for Phase I of Inj. Upgrade
- Pedestal Location Surveys
- Install Chopper SSA's
- Chopper SSA LCW
- Penetration Drops
- Remove and re-install BPM's Gun to chopper
- Install new IPM2I03
- Remove and calibrate current monitoring electronics
- Harp work
- Testing Wien HV Controls at UITF
- Perform Installation work for newly added Injector bpm during 2020 SAD
- IOCSE11 & IOCINSE4 BPM Controls Update
- Install and Commission Wien filter Power Supplies
- Install PSS jumpers for laser work at the Injector
- Relocate Recepacles Downstairs in Injector Bldg.53
- CIS SAD Tasks
- New Gun2 loading chamber
- Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
- Fix IHWP readback during SAD
- CEBAF Lead Bricks : Collect, Sort, Clean, Paint, Store
- Injector Related SAD Tasks
- Install and Commission Wien filter Power Supplies] (magnet PS)
- Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]
- PSS Injector Interface Chassis removal
- PSS Injector Segment PLC Upgrade
- PSS Injector Interface Chassis removal
- PSS CAMAC Relay cards replacement with VME versions for Injector and BSY
- I&C Injector Camac to Vme and camera upgrade
- I&C Upgrade harps to PC104
- I&C Upgrade existing ItoV System with ItoV VME cards
- I&C Accelerator network re-survey
- FAC Tunnel Fire Alarm and Suppression Replacement
- Apply labels to I&C components during 2020 SAD
- Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ
- Neutron Detector System Installation (SAD 2020)
- UHV Power Supply Replacement (ISB)
- Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version
- Trim Utility Chassis Upgrade - All CEBAF Trim Racks
- SAD 2020: P.M. of 24V Vacuum Power Supply Chassis
- VME crate upgrade to IOCIN3
- Remove old Sonitrol system hardware from NA and SA
- Shutdown of Panel I-BT in the Injector
- Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b)
- Software Controls PSS Injector and North Linac changes on iocsoftsafe2
- B53 (INJ SB) Panelboard PM
- Perform Basic PM of 45 MeV spectrometer Power Supply
- 2020 SAD and Beyond CAMAC / VME PM maintenance and repairs
- iocin1 - VME crate replacement