Difference between revisions of "NPS Subsystems"

From Cuawiki
Jump to navigation Jump to search
Line 12: Line 12:
  
 
* Fringe field considerations (2016)
 
* Fringe field considerations (2016)
 +
::* [https://wiki.jlab.org/cuawiki/images/e/e3/NPS_HMS_optics_fields.pdf Summary]
  
 
* Minimum aperture layout (2016)
 
* Minimum aperture layout (2016)

Revision as of 16:26, 12 May 2019

NPS Layout

  • Initial cabling evaluation (2016)

NPS Magnet

  • Initial calculations (2015)
  • Fringe field considerations (2016)
  • Minimum aperture layout (2016)
  • Background studies (2016)
  • Vertical vs horizontal field
  • Effect of field on PMTs
  • Shielding concept
  • Construction updates
  • Assembly (2018-2019)

Calorimeter

  • Frame
  • Crystals
  • PMTs and HV dividers
  • NPS prototype studies
  • 3x3 prototype report (2019)
  • Initial component studies

DAQ and Trigger

  • Initial equipment count and rate estimates (2017)

Controls

Data Analysis

Monte Carlo

Experiments