Difference between revisions of "NPS Assembly"

From Cuawiki
Jump to navigation Jump to search
Line 22: Line 22:
 
::* [https://docs.google.com/spreadsheets/d/11tthz375eiESTezsGdbkZbNq6eGj3ssPKPLIYQ9iE0A/edit#gid=2133090489 Crystal ID Documentation]
 
::* [https://docs.google.com/spreadsheets/d/11tthz375eiESTezsGdbkZbNq6eGj3ssPKPLIYQ9iE0A/edit#gid=2133090489 Crystal ID Documentation]
 
::* [https://wiki.jlab.org/cuawiki/images/7/7c/PWO_wrapping.pdf Pictures from crystal wrapping]
 
::* [https://wiki.jlab.org/cuawiki/images/7/7c/PWO_wrapping.pdf Pictures from crystal wrapping]
 +
 +
=== Cabling - COMPLETE (11/14/2022) ===
 +
 +
* Onsite contacts: Yeran, Brad
 +
 +
* '''Partisipants'''
 +
 +
::* '''AANL''' (A.Alikhanyan National Science Laboratory)
 +
:::* Mkrtchyan Hamlet
 +
:::* Voskanyan Hakob
 +
:::* Tadevosyan Vardan
 +
:::*Mkrtchyan Arthur
 +
::* '''CUA''' (Catholic University of America)
 +
:::* Ghandilyan Yeranuhi
 +
::* '''MSU''' (Mississippi State Universtiy)
 +
:::* Abishek Karki
 +
::* '''OU''' (Ohio University)
 +
:::* Pramita Tiwari
 +
::* '''GU''' (University of Glasgow)
 +
:::* Oliver Jevons
 +
:::* Gary Penman
 +
* '''Bundling'''
 +
:::* Laying 12 cables one by one on the floor
 +
:::* tying with zip ties
 +
:::* making a bundle
 +
:::* Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180
 +
::* [https://userweb.jlab.org/~yeran/nps-cabling.pdf NPS cabling]
  
 
=== Assembly ===
 
=== Assembly ===

Revision as of 22:11, 30 November 2022

Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly - COMPLETE (5/27/2022)

  • On site personnel: AANL (2), CUA (3), MSU (1), UIC (1), DSG (1-2, at the end of May); onsite contacts: Vladimir, Brad
  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • Crystal Wrapping Documentation

Cabling - COMPLETE (11/14/2022)

  • Onsite contacts: Yeran, Brad
  • Partisipants
  • AANL (A.Alikhanyan National Science Laboratory)
  • Mkrtchyan Hamlet
  • Voskanyan Hakob
  • Tadevosyan Vardan
  • Mkrtchyan Arthur
  • CUA (Catholic University of America)
  • Ghandilyan Yeranuhi
  • MSU (Mississippi State Universtiy)
  • Abishek Karki
  • OU (Ohio University)
  • Pramita Tiwari
  • GU (University of Glasgow)
  • Oliver Jevons
  • Gary Penman
  • Bundling
  • Laying 12 cables one by one on the floor
  • tying with zip ties
  • making a bundle
  • Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180

Assembly

  • Multiple phases:
  • crystal stacking
  • PMT block assembly
  • cabling and installation of the big PCBs
  • preparation for detector checkout
  • detector checkout
  • Crystal stacking - COMPLETE (10 June 2022)
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
  • All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled NPS picture
  • Preparation for detector checkout - planned for July/August
  • onsite personnel: AANL (2), CUA (1-2), OU (2-3); onsite contacts: Brad, Julie/Paul, Carlos
  • In order to perform the detector tests, there is work to be done outside the calorimeter box:
  • HV cables, signal cables and LV cables need to be put in place and hooked to the DAQ, which needs to be setup.
  • Power supplies (HV, LV) need to be setup.
  • Same for slow controls (for HV and LED), etc.
  • Detector Checkout - planned for August

Mechanical

  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)

Magnet

Crystals

  • Overview of crystal properties