=== Resource List ===
 
=== Resource List ===
 +
 +
* [https://logbooks.jlab.org/book/nps NPS Logbook]
 +
 +
* [https://wiki.jlab.org/cuawiki/index.php/NPS_Controls NPS Controls]
  
 
* [https://docs.google.com/spreadsheets/d/10Lb_IsyyKrGzwpFiZ1tp_qIb_C_31xLl66-4msvcqjA/edit#gid=0 Onsite Personnel Spreadsheet]
 
* [https://docs.google.com/spreadsheets/d/10Lb_IsyyKrGzwpFiZ1tp_qIb_C_31xLl66-4msvcqjA/edit#gid=0 Onsite Personnel Spreadsheet]
Line 77: Line 81:
 
:::* [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx excel file]
 
:::* [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx excel file]
  
* Detector checkout preparations - ongoing in EEL108
+
* Detector checkout preparations - '''ONGOING''' in EEL108
 
::* onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
 
::* onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
 
::* Steps towards performing the detector tests - outside the calorimeter box:  
 
::* Steps towards performing the detector tests - outside the calorimeter box:  
:::* Install HV cables, signal cables and LV cables and hooked to the DAQ
+
:::* Install HV cables, signal cables and LV cables and hooked to the DAQ - COMPLETE (2/7/2023)
 
:::* Set up DAQ
 
:::* Set up DAQ
 
:::* Set up power supplies (HV, LV) and slow controls
 
:::* Set up power supplies (HV, LV) and slow controls
  
* Detector Checkout - planned for February - mid-April 2023
+
* Detector Checkout - '''PLANNED for February - mid-April 2023''' in EEL108
 
::* onsite personnel: AANL (2), CUA (1-2), ODU (2); onsite contacts: Simona, Bob
 
::* onsite personnel: AANL (2), CUA (1-2), ODU (2); onsite contacts: Simona, Bob
 
::* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists]
 
::* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists]
  
 
=== Mechanical ===
 
=== Mechanical ===
 +
 +
* Status Updates
 +
 +
::* [https://wiki.jlab.org/cuawiki/images/2/2d/NPS_Status_FEB_2023psm.pptx February 2023 including layout configurations]
 +
 +
::* [https://wiki.jlab.org/cuawiki/images/4/45/NPS_Status_FEB_2022psm.pptx Status February 2022 and SAD workplan]
 +
 +
::* [https://wiki.jlab.org/cuawiki/images/1/18/NPS_Status_JAN_2021psm.pptx Status January 2021 including layout configurations]
 +
 +
* [https://wiki.jlab.org/cuawiki/images/1/11/NPS_Initial_Installation.pdf Overview Installation Plan] (February 2023)
  
 
* NPS Deck Pictures (April 2022)
 
* NPS Deck Pictures (April 2022)
Line 97: Line 111:
 
::* [https://wiki.jlab.org/cuawiki/images/c/c8/IMG_0097.jpg Pic1], [https://wiki.jlab.org/cuawiki/images/0/05/IMG_0111.jpg Pic2], [https://wiki.jlab.org/cuawiki/images/b/b7/IMG_0112.jpg Pic3]
 
::* [https://wiki.jlab.org/cuawiki/images/c/c8/IMG_0097.jpg Pic1], [https://wiki.jlab.org/cuawiki/images/0/05/IMG_0111.jpg Pic2], [https://wiki.jlab.org/cuawiki/images/b/b7/IMG_0112.jpg Pic3]
 
::* [https://wiki.jlab.org/cuawiki/index.php/File:Deck-Flatness.JPG Drawing deck flatness]
 
::* [https://wiki.jlab.org/cuawiki/index.php/File:Deck-Flatness.JPG Drawing deck flatness]
 
* [https://wiki.jlab.org/cuawiki/images/4/45/NPS_Status_FEB_2022psm.pptx Status February 2022 and SAD workplan]
 
  
 
* [https://wiki.jlab.org/cuawiki/images/d/d0/NPS_OUTSTANDING_PROJECTS_8-26-2021.pptx Remaining Project Items (8/2021)]
 
* [https://wiki.jlab.org/cuawiki/images/d/d0/NPS_OUTSTANDING_PROJECTS_8-26-2021.pptx Remaining Project Items (8/2021)]
  
* [https://wiki.jlab.org/cuawiki/images/1/18/NPS_Status_JAN_2021psm.pptx Status January 2021 including layout configurations]
+
=== DAQ/Electronics/Analyzer ===
  
=== DAQ/Electronics/Analyzer ===
+
* [https://wiki.jlab.org/cuawiki/index.php/DAQ_in_EEL_108 DAQ in EEL108]
  
 
* [https://wiki.jlab.org/cuawiki/index.php/Meeting-06232022 Link to DAQ/Electronics/Analyzer activities]; contact David Hamilton for details.
 
* [https://wiki.jlab.org/cuawiki/index.php/Meeting-06232022 Link to DAQ/Electronics/Analyzer activities]; contact David Hamilton for details.

Latest revision as of 16:02, 7 February 2023

Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly - COMPLETE (5/27/2022)

  • On site personnel: AANL (Hamlet Mkrtchyan, Vardan Tadevosyan), CUA (Vladimir Berdnikov, Josh Crafts, Petr Stepanov), MSU (Abishek Karki), UIC (ZHeng Huang); onsite contacts: Vladimir, Brad
  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • Crystal Wrapping Documentation

Cabling - COMPLETE (11/18/2022)

  • Onsite contacts: Yeran, Brad
  • Participants
  • AANL (A.Alikhanyan National Science Laboratory)
  • Mkrtchyan Hamlet
  • Voskanyan Hakob
  • Tadevosyan Vardan
  • Mkrtchyan Arthur
  • CUA (Catholic University of America)
  • Ghandilyan Yeranuhi
  • MSU (Mississippi State Universtiy)
  • Abishek Karki
  • OU (Ohio University)
  • Pramita Tiwari
  • GU (University of Glasgow)
  • Oliver Jevons
  • Gary Penman
  • Bundling
  • putting 12 cables on the ground one by one on
  • tying with zip ties in each 3m
  • making a bundle
  • Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180

Assembly

  • Resources:
  • Overview of the phases of the assembly:
  • crystal stacking - DONE
  • PMT block assembly - DONE
  • Cabling and installation of the big PCBs - DONE
  • preparation for detector checkout - ONGOING
  • detector checkout - February - mid-April 2023
  • Crystal stacking - COMPLETE (10 June 2022)
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
  • All crystals are stacked, sown here with 4 full columns of PMTs and electronics are cabled - assembled NPS picture
  • PMT block assembly - COMPLETE (January 2023)
  • Cabling and installation of the big PCBs - COMPLETE (January 2023)
  • Detector checkout preparations - ONGOING in EEL108
  • onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
  • Steps towards performing the detector tests - outside the calorimeter box:
  • Install HV cables, signal cables and LV cables and hooked to the DAQ - COMPLETE (2/7/2023)
  • Set up DAQ
  • Set up power supplies (HV, LV) and slow controls
  • Detector Checkout - PLANNED for February - mid-April 2023 in EEL108

Mechanical

  • Status Updates
  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)

Magnet

Crystals

  • Overview of crystal properties