Difference between revisions of "NPS Assembly"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
=== Resource List === | === Resource List === | ||
+ | |||
+ | * [https://logbooks.jlab.org/book/nps NPS Logbook] | ||
+ | |||
+ | * [https://wiki.jlab.org/cuawiki/index.php/NPS_Controls NPS Controls] | ||
* [https://docs.google.com/spreadsheets/d/10Lb_IsyyKrGzwpFiZ1tp_qIb_C_31xLl66-4msvcqjA/edit#gid=0 Onsite Personnel Spreadsheet] | * [https://docs.google.com/spreadsheets/d/10Lb_IsyyKrGzwpFiZ1tp_qIb_C_31xLl66-4msvcqjA/edit#gid=0 Onsite Personnel Spreadsheet] | ||
− | |||
− | |||
=== Pre-assembly - COMPLETE (5/27/2022) === | === Pre-assembly - COMPLETE (5/27/2022) === | ||
Line 82: | Line 84: | ||
::* onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran | ::* onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran | ||
::* Steps towards performing the detector tests - outside the calorimeter box: | ::* Steps towards performing the detector tests - outside the calorimeter box: | ||
− | :::* Install HV cables, signal cables and LV cables and hooked to the DAQ | + | :::* Install HV cables, signal cables and LV cables and hooked to the DAQ - COMPLETE (2/7/2023) |
:::* Set up DAQ | :::* Set up DAQ | ||
:::* Set up power supplies (HV, LV) and slow controls | :::* Set up power supplies (HV, LV) and slow controls | ||
Line 113: | Line 115: | ||
=== DAQ/Electronics/Analyzer === | === DAQ/Electronics/Analyzer === | ||
+ | |||
+ | * [https://wiki.jlab.org/cuawiki/index.php/DAQ_in_EEL_108 DAQ in EEL108] | ||
* [https://wiki.jlab.org/cuawiki/index.php/Meeting-06232022 Link to DAQ/Electronics/Analyzer activities]; contact David Hamilton for details. | * [https://wiki.jlab.org/cuawiki/index.php/Meeting-06232022 Link to DAQ/Electronics/Analyzer activities]; contact David Hamilton for details. |
Latest revision as of 16:02, 7 February 2023
Task List 2022
- Link to the Google Doc
Resource List
Pre-assembly - COMPLETE (5/27/2022)
- On site personnel: AANL (Hamlet Mkrtchyan, Vardan Tadevosyan), CUA (Vladimir Berdnikov, Josh Crafts, Petr Stepanov), MSU (Abishek Karki), UIC (ZHeng Huang); onsite contacts: Vladimir, Brad
- Reflector pre-shaping procedure and material
- Crystal Wrapping Procedure Link
- Crystal Wrapping Documentation
Cabling - COMPLETE (11/18/2022)
- Onsite contacts: Yeran, Brad
- Participants
- AANL (A.Alikhanyan National Science Laboratory)
- Mkrtchyan Hamlet
- Voskanyan Hakob
- Tadevosyan Vardan
- Mkrtchyan Arthur
- CUA (Catholic University of America)
- Ghandilyan Yeranuhi
- MSU (Mississippi State Universtiy)
- Abishek Karki
- OU (Ohio University)
- Pramita Tiwari
- GU (University of Glasgow)
- Oliver Jevons
- Gary Penman
- Bundling
- putting 12 cables on the ground one by one on
- tying with zip ties in each 3m
- making a bundle
- Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180
Assembly
- Resources:
- Overview of the phases of the assembly:
- crystal stacking - DONE
- PMT block assembly - DONE
- Cabling and installation of the big PCBs - DONE
- preparation for detector checkout - ONGOING
- detector checkout - February - mid-April 2023
- Crystal stacking - COMPLETE (10 June 2022)
- onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
- All crystals are stacked, sown here with 4 full columns of PMTs and electronics are cabled - assembled NPS picture
- PMT block assembly - COMPLETE (January 2023)
- Cabling and installation of the big PCBs - COMPLETE (January 2023)
- Detector checkout preparations - ONGOING in EEL108
- onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
- Steps towards performing the detector tests - outside the calorimeter box:
- Install HV cables, signal cables and LV cables and hooked to the DAQ - COMPLETE (2/7/2023)
- Set up DAQ
- Set up power supplies (HV, LV) and slow controls
- Detector Checkout - PLANNED for February - mid-April 2023 in EEL108
- onsite personnel: AANL (2), CUA (1-2), ODU (2); onsite contacts: Simona, Bob
- Detector checkout plans and task lists
Mechanical
- Status Updates
- Overview Installation Plan (February 2023)
- NPS Deck Pictures (April 2022)
- NPS Deck Pictures (March 2022)
DAQ/Electronics/Analyzer
- Link to DAQ/Electronics/Analyzer activities; contact David Hamilton for details.
- GitHub link (contact Brad, Carlos Y., or Steve W. for access)
Magnet
Crystals
- Overview of crystal properties
- spreadsheet from CRYTUR (January 2022) (dimensions, transmittance, light yield, radiation hardness)