Difference between revisions of "NPS Subsystems"

From Cuawiki
Jump to navigation Jump to search
Line 49: Line 49:
 
::* High Voltage cables fabrication and testing
 
::* High Voltage cables fabrication and testing
 
::* CAEN HV system testing
 
::* CAEN HV system testing
::* Control and monitoring screens development
 
::* Interlock system
 
  
 
* NPS prototype studies
 
* NPS prototype studies
Line 70: Line 68:
  
 
== Controls ==  
 
== Controls ==  
 +
 +
* [https://www.jlab.org/physics/dsg/technical_documentation/hall_c/NPS Detector Support Group]
 +
::* Control and monitoring screens development
 +
::* Interlock system
  
 
== Data Analysis ==
 
== Data Analysis ==

Revision as of 12:14, 25 January 2021

NPS Layout

NPS Magnet

  • Assembly (2018-2019)
  • Construction updates
  • Vertical vs horizontal field
  • Effect of field on PMTs
  • Shielding concept
  • Fringe field considerations (2016)

Calorimeter

  • Frame
  • Crystals
  • PMTs and HV dividers
  • High Voltage cables fabrication and testing
  • CAEN HV system testing
  • NPS prototype studies
  • 3x3 prototype report (2019)
  • Initial component studies
  • LED studies - PMT sensitivity (2014)

DAQ and Trigger

  • Initial equipment count and rate estimates (2017)

Controls

  • Control and monitoring screens development
  • Interlock system

Data Analysis

Monte Carlo

Experiments

NPS Assembly preparations