Line 52: | Line 52: | ||
=== Assembly === | === Assembly === | ||
− | * [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps] | + | * Resources: |
− | + | ::* [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps] | |
− | |||
− | |||
− | |||
− | |||
− | |||
::* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate] | ::* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate] | ||
+ | ::* [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet] | ||
+ | |||
+ | * Multiple phases of the assembly: | ||
+ | ::* crystal stacking - DONE | ||
+ | ::* PMT block assembly - DONE | ||
+ | ::* Cabling and installation of the big PCBs - DONE | ||
+ | ::* preparation for detector checkout - ONGOING | ||
+ | ::* detector checkout - February - mid-April 2023 | ||
* Crystal stacking - COMPLETE (10 June 2022) | * Crystal stacking - COMPLETE (10 June 2022) | ||
Line 65: | Line 68: | ||
::* All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled [https://wiki.jlab.org/cuawiki/images/7/7b/Nps0.jpeg NPS picture] | ::* All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled [https://wiki.jlab.org/cuawiki/images/7/7b/Nps0.jpeg NPS picture] | ||
− | * | + | * PMT block assembly - COMPLETE (January 2023) |
− | |||
− | |||
− | |||
− | |||
− | |||
− | * | + | * Cabling and installation of the big PCBs - COMPLETE (January 2023) |
− | ::* | + | ::* Pictures: [https://wiki.jlab.org/cuawiki/images/2/23/NPS-assembly-with-PCBs.png Pic1], [https://wiki.jlab.org/cuawiki/images/d/d3/NPS-assembly-with-PCBs-from-front.png Pic2], [https://wiki.jlab.org/cuawiki/images/a/a3/NPS-assembly-with-PCBs-PMT-maintenance.png Pic3], [https://wiki.jlab.org/cuawiki/images/6/60/NPS-assembly-with-PCBs-side-closeup.png Pic4], [https://wiki.jlab.org/cuawiki/images/2/27/NPS-assembly-with-PCBs-side-closeup-2.png Pic5] |
− | ::* [https://wiki.jlab.org/cuawiki/ | + | ::* Crystal+PMT+Cable module map as viewed from the back |
+ | :::* [https://wiki.jlab.org/cuawiki/images/1/1d/02_Crystals_PMT_Mounting_View_BACK.pdf pdf file] | ||
+ | :::* [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx excel file] | ||
− | * | + | * Detector checkout preparations - ongoing in EEL108 |
− | ::* | + | ::* onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran |
− | ::* | + | ::* Steps towards performing the detector tests - outside the calorimeter box: |
+ | :::* Install HV cables, signal cables and LV cables and hooked to the DAQ | ||
+ | :::* Set up DAQ | ||
+ | :::* Set up power supplies (HV, LV) and slow controls | ||
− | * [https://wiki.jlab.org/cuawiki/ | + | * Detector Checkout - planned for February - mid-April 2023 |
+ | ::* onsite personnel: AANL (2), CUA (1-2), ODU (2); onsite contacts: Simona, Bob | ||
+ | ::* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists] | ||
=== Mechanical === | === Mechanical === |
Revision as of 14:24, 7 February 2023
Task List 2022
- Link to the Google Doc
Resource List
Pre-assembly - COMPLETE (5/27/2022)
- On site personnel: AANL (Hamlet Mkrtchyan, Vardan Tadevosyan), CUA (Vladimir Berdnikov, Josh Crafts, Petr Stepanov), MSU (Abishek Karki), UIC (ZHeng Huang); onsite contacts: Vladimir, Brad
- Reflector pre-shaping procedure and material
- Crystal Wrapping Procedure Link
- Crystal Wrapping Documentation
Cabling - COMPLETE (11/18/2022)
- Onsite contacts: Yeran, Brad
- Partisipants
- AANL (A.Alikhanyan National Science Laboratory)
- Mkrtchyan Hamlet
- Voskanyan Hakob
- Tadevosyan Vardan
- Mkrtchyan Arthur
- CUA (Catholic University of America)
- Ghandilyan Yeranuhi
- MSU (Mississippi State Universtiy)
- Abishek Karki
- OU (Ohio University)
- Pramita Tiwari
- GU (University of Glasgow)
- Oliver Jevons
- Gary Penman
- Bundling
- putting 12 cables on the ground one by one on
- tying with zip ties in each 3m
- making a bundle
- Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180
Assembly
- Resources:
- Multiple phases of the assembly:
- crystal stacking - DONE
- PMT block assembly - DONE
- Cabling and installation of the big PCBs - DONE
- preparation for detector checkout - ONGOING
- detector checkout - February - mid-April 2023
- Crystal stacking - COMPLETE (10 June 2022)
- onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
- All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled NPS picture
- PMT block assembly - COMPLETE (January 2023)
- Cabling and installation of the big PCBs - COMPLETE (January 2023)
- Detector checkout preparations - ongoing in EEL108
- onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
- Steps towards performing the detector tests - outside the calorimeter box:
- Install HV cables, signal cables and LV cables and hooked to the DAQ
- Set up DAQ
- Set up power supplies (HV, LV) and slow controls
- Detector Checkout - planned for February - mid-April 2023
- onsite personnel: AANL (2), CUA (1-2), ODU (2); onsite contacts: Simona, Bob
- Detector checkout plans and task lists
Mechanical
- NPS Deck Pictures (April 2022)
- NPS Deck Pictures (March 2022)
DAQ/Electronics/Analyzer
- Link to DAQ/Electronics/Analyzer activities; contact David Hamilton for details.
- GitHub link (contact Brad, Carlos Y., or Steve W. for access)
Magnet
Crystals
- Overview of crystal properties
- spreadsheet from CRYTUR (January 2022) (dimensions, transmittance, light yield, radiation hardness)