Line 52: Line 52:
 
=== Assembly ===
 
=== Assembly ===
  
* [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps]
+
* Resources:
::* Multiple phases:
+
::* [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps]
:::* crystal stacking
 
:::* PMT block assembly
 
:::* cabling and installation of the big PCBs [https://wiki.jlab.org/cuawiki/images/2/23/NPS-assembly-with-PCBs.png Pic1], [https://wiki.jlab.org/cuawiki/images/d/d3/NPS-assembly-with-PCBs-from-front.png Pic2], [https://wiki.jlab.org/cuawiki/images/a/a3/NPS-assembly-with-PCBs-PMT-maintenance.png Pic3], [https://wiki.jlab.org/cuawiki/images/6/60/NPS-assembly-with-PCBs-side-closeup.png Pic4], [https://wiki.jlab.org/cuawiki/images/2/27/NPS-assembly-with-PCBs-side-closeup-2.png Pic5]
 
:::* preparation for detector checkout
 
:::* detector checkout
 
 
::* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate]
 
::* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate]
 +
::* [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet]
 +
 +
* Multiple phases of the assembly:
 +
::* crystal stacking - DONE
 +
::* PMT block assembly - DONE
 +
::* Cabling and installation of the big PCBs - DONE
 +
::* preparation for detector checkout - ONGOING
 +
::* detector checkout - February - mid-April 2023
  
 
* Crystal stacking - COMPLETE (10 June 2022)  
 
* Crystal stacking - COMPLETE (10 June 2022)  
Line 65: Line 68:
 
::* All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled [https://wiki.jlab.org/cuawiki/images/7/7b/Nps0.jpeg NPS picture]
 
::* All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled [https://wiki.jlab.org/cuawiki/images/7/7b/Nps0.jpeg NPS picture]
  
* Preparation for detector checkout - planned for July/August
+
* PMT block assembly - COMPLETE (January 2023)
::* onsite personnel: AANL (2), CUA (1-2), OU (2-3); onsite contacts: Brad, Julie/Paul, Carlos
 
::* In order to perform the detector tests, there is work to be done outside the calorimeter box:
 
:::* HV cables, signal cables and LV cables need to be put in place and hooked to the DAQ, which needs to be setup.
 
:::* Power supplies (HV, LV) need to be setup.
 
:::* Same for slow controls (for HV and LED), etc.
 
  
* Detector Checkout - planned for August
+
* Cabling and installation of the big PCBs - COMPLETE (January 2023)
::* onsite personnel: OU (1-2), AANL (2), CUA (1-2), U. Glasgow (3); onsite contacts: Brad, David H.
+
::* Pictures: [https://wiki.jlab.org/cuawiki/images/2/23/NPS-assembly-with-PCBs.png Pic1], [https://wiki.jlab.org/cuawiki/images/d/d3/NPS-assembly-with-PCBs-from-front.png Pic2], [https://wiki.jlab.org/cuawiki/images/a/a3/NPS-assembly-with-PCBs-PMT-maintenance.png Pic3], [https://wiki.jlab.org/cuawiki/images/6/60/NPS-assembly-with-PCBs-side-closeup.png Pic4], [https://wiki.jlab.org/cuawiki/images/2/27/NPS-assembly-with-PCBs-side-closeup-2.png Pic5]
::* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists]
+
::* Crystal+PMT+Cable module map as viewed from the back
 +
:::* [https://wiki.jlab.org/cuawiki/images/1/1d/02_Crystals_PMT_Mounting_View_BACK.pdf pdf file]
 +
:::* [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx excel file]
  
* Crystal+PMT+Cable module map as viewed from the back
+
* Detector checkout preparations - ongoing in EEL108
::* [https://wiki.jlab.org/cuawiki/images/1/1d/02_Crystals_PMT_Mounting_View_BACK.pdf pdf file]
+
::* onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
::* [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx excel file]
+
::* Steps towards performing the detector tests - outside the calorimeter box:
 +
:::* Install HV cables, signal cables and LV cables and hooked to the DAQ
 +
:::* Set up DAQ
 +
:::* Set up power supplies (HV, LV) and slow controls
  
* [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet]
+
* Detector Checkout - planned for February - mid-April 2023
 +
::* onsite personnel: AANL (2), CUA (1-2), ODU (2); onsite contacts: Simona, Bob
 +
::* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists]
  
 
=== Mechanical ===
 
=== Mechanical ===

Revision as of 14:24, 7 February 2023

Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly - COMPLETE (5/27/2022)

  • On site personnel: AANL (Hamlet Mkrtchyan, Vardan Tadevosyan), CUA (Vladimir Berdnikov, Josh Crafts, Petr Stepanov), MSU (Abishek Karki), UIC (ZHeng Huang); onsite contacts: Vladimir, Brad
  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • Crystal Wrapping Documentation

Cabling - COMPLETE (11/18/2022)

  • Onsite contacts: Yeran, Brad
  • Partisipants
  • AANL (A.Alikhanyan National Science Laboratory)
  • Mkrtchyan Hamlet
  • Voskanyan Hakob
  • Tadevosyan Vardan
  • Mkrtchyan Arthur
  • CUA (Catholic University of America)
  • Ghandilyan Yeranuhi
  • MSU (Mississippi State Universtiy)
  • Abishek Karki
  • OU (Ohio University)
  • Pramita Tiwari
  • GU (University of Glasgow)
  • Oliver Jevons
  • Gary Penman
  • Bundling
  • putting 12 cables on the ground one by one on
  • tying with zip ties in each 3m
  • making a bundle
  • Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180

Assembly

  • Resources:
  • Multiple phases of the assembly:
  • crystal stacking - DONE
  • PMT block assembly - DONE
  • Cabling and installation of the big PCBs - DONE
  • preparation for detector checkout - ONGOING
  • detector checkout - February - mid-April 2023
  • Crystal stacking - COMPLETE (10 June 2022)
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
  • All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled NPS picture
  • PMT block assembly - COMPLETE (January 2023)
  • Cabling and installation of the big PCBs - COMPLETE (January 2023)
  • Detector checkout preparations - ongoing in EEL108
  • onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
  • Steps towards performing the detector tests - outside the calorimeter box:
  • Install HV cables, signal cables and LV cables and hooked to the DAQ
  • Set up DAQ
  • Set up power supplies (HV, LV) and slow controls
  • Detector Checkout - planned for February - mid-April 2023

Mechanical

  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)

Magnet

Crystals

  • Overview of crystal properties