Difference between revisions of "NPS Assembly"

From Cuawiki
Jump to navigation Jump to search
(Created page with "Task List 2021 Resource List")
 
 
(69 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Task List 2021
+
=== Task List 2022 ===
  
Resource List
+
* [https://docs.google.com/spreadsheets/d/1U8uDcosQGinClnzve7itGhXh4Tw2ejAKjddL4y49THE/edit#gid=0 Link] to the Google Doc
 +
 
 +
=== Resource List ===
 +
 
 +
* [https://logbooks.jlab.org/book/nps NPS Logbook]
 +
 
 +
* [https://wiki.jlab.org/cuawiki/index.php/NPS_Controls NPS Controls]
 +
 
 +
* [https://docs.google.com/spreadsheets/d/10Lb_IsyyKrGzwpFiZ1tp_qIb_C_31xLl66-4msvcqjA/edit#gid=0 Onsite Personnel Spreadsheet]
 +
 
 +
=== Pre-assembly - COMPLETE (5/27/2022) ===
 +
 
 +
* On site personnel: '''AANL''' (Hamlet Mkrtchyan, Vardan Tadevosyan), '''CUA''' (Vladimir Berdnikov, Josh Crafts, Petr Stepanov), '''MSU''' (Abishek Karki), '''UIC''' (ZHeng Huang); '''onsite contacts''': Vladimir, Brad
 +
 
 +
* Reflector pre-shaping procedure and material
 +
 
 +
::* [https://wiki.jlab.org/cuawiki/images/6/67/Preshaping_manual_CCAL.pdf Pre-shaping ESR]
 +
::* [https://wiki.jlab.org/cuawiki/images/8/8a/ESR_preshaping.pdf ESR pre-shaping procedure for NPS]
 +
::* [https://wiki.jlab.org/cuawiki/images/3/36/3M-ESR-TDS.pdf Data sheet for ESR]
 +
 
 +
* Crystal Wrapping Procedure [https://wiki.jlab.org/cuawiki/index.php/Wrapping_procedure Link]
 +
 
 +
* Crystal Wrapping Documentation
 +
::* [https://docs.google.com/spreadsheets/d/11tthz375eiESTezsGdbkZbNq6eGj3ssPKPLIYQ9iE0A/edit#gid=2133090489 Crystal ID Documentation]
 +
::* [https://wiki.jlab.org/cuawiki/images/7/7c/PWO_wrapping.pdf Pictures from crystal wrapping]
 +
 
 +
=== Cabling - COMPLETE (11/18/2022) ===
 +
 
 +
* Onsite contacts: Yeran, Brad
 +
 
 +
* '''Participants'''
 +
 
 +
::* '''AANL''' (A.Alikhanyan National Science Laboratory)
 +
:::* Mkrtchyan Hamlet
 +
:::* Voskanyan Hakob
 +
:::* Tadevosyan Vardan
 +
:::*Mkrtchyan Arthur
 +
::* '''CUA''' (Catholic University of America)
 +
:::* Ghandilyan Yeranuhi
 +
::* '''MSU''' (Mississippi State Universtiy)
 +
:::* Abishek Karki
 +
::* '''OU''' (Ohio University)
 +
:::* Pramita Tiwari
 +
::* '''GU''' (University of Glasgow)
 +
:::* Oliver Jevons
 +
:::* Gary Penman
 +
* '''Bundling'''
 +
:::* putting 12 cables on the ground one by one on
 +
:::* tying with zip ties in each 3m
 +
:::* making a bundle
 +
:::* Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180
 +
::* [https://userweb.jlab.org/~yeran/nps-cabling.pdf NPS cabling]
 +
::* [https://userweb.jlab.org/~yeran/NPS-Feb-2.pdf Summary of the NPS cabling (2/2023)]
 +
 
 +
=== Assembly ===
 +
 
 +
* Resources:
 +
::* [http://www.jlab.org/~munoz/NPS_mounting_procedure.pptx Assembly Procedure Steps]
 +
::* [https://wiki.jlab.org/cuawiki/images/6/67/Time_mounting_graph.xlsx Assembly time estimate]
 +
::* [https://wiki.jlab.org/cuawiki/images/b/b7/NPS-module-assembly-tracking-sheet_v2.xlsx NPS module assembly tracking spreadsheet]
 +
 
 +
* Overview of the phases of the assembly:
 +
::* crystal stacking - DONE
 +
::* PMT block assembly - DONE
 +
::* Cabling and installation of the big PCBs - DONE
 +
::* preparation for detector checkout - ONGOING
 +
::* detector checkout - February - mid-April 2023
 +
 
 +
* Crystal stacking - COMPLETE (10 June 2022)
 +
::* onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
 +
::* All crystals are stacked, sown here with 4 full columns of PMTs and electronics are cabled - assembled [https://wiki.jlab.org/cuawiki/images/7/7b/Nps0.jpeg NPS picture]
 +
 
 +
* PMT block assembly - COMPLETE (January 2023)
 +
 
 +
* Cabling and installation of the big PCBs - COMPLETE (January 2023)
 +
::* Pictures: [https://wiki.jlab.org/cuawiki/images/2/23/NPS-assembly-with-PCBs.png Pic1], [https://wiki.jlab.org/cuawiki/images/d/d3/NPS-assembly-with-PCBs-from-front.png Pic2], [https://wiki.jlab.org/cuawiki/images/a/a3/NPS-assembly-with-PCBs-PMT-maintenance.png Pic3], [https://wiki.jlab.org/cuawiki/images/6/60/NPS-assembly-with-PCBs-side-closeup.png Pic4], [https://wiki.jlab.org/cuawiki/images/2/27/NPS-assembly-with-PCBs-side-closeup-2.png Pic5]
 +
::* Crystal+PMT+Cable module map as viewed from the back
 +
:::* [https://wiki.jlab.org/cuawiki/images/1/1d/02_Crystals_PMT_Mounting_View_BACK.pdf pdf file]
 +
:::* [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx excel file]
 +
 
 +
* Detector checkout preparations - '''ONGOING''' in EEL108
 +
::* onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
 +
::* Steps towards performing the detector tests - outside the calorimeter box:
 +
:::* Install HV cables, signal cables and LV cables and hooked to the DAQ - COMPLETE (2/7/2023)
 +
:::* Set up DAQ
 +
:::* Set up power supplies (HV, LV) and slow controls
 +
 
 +
* Detector Checkout - '''PLANNED for February - mid-April 2023''' in EEL108
 +
::* onsite personnel: AANL (2), CUA (1-2), ODU (2); onsite contacts: Simona, Bob
 +
::* [https://wiki.jlab.org/cuawiki/index.php/NPS_DAQ/Electronics_and_Analyzer_Meeting_(online,_2/25_2022) Detector checkout plans and task lists]
 +
 
 +
=== Mechanical ===
 +
 
 +
* Status Updates
 +
 
 +
::* [https://wiki.jlab.org/cuawiki/images/2/2d/NPS_Status_FEB_2023psm.pptx February 2023 including layout configurations]
 +
 
 +
::* [https://wiki.jlab.org/cuawiki/images/4/45/NPS_Status_FEB_2022psm.pptx Status February 2022 and SAD workplan]
 +
 
 +
::* [https://wiki.jlab.org/cuawiki/images/1/18/NPS_Status_JAN_2021psm.pptx Status January 2021 including layout configurations]
 +
 
 +
* [https://wiki.jlab.org/cuawiki/images/1/11/NPS_Initial_Installation.pdf Overview Installation Plan] (February 2023)
 +
 
 +
* NPS Deck Pictures (April 2022)
 +
::* 11 April: [https://wiki.jlab.org/cuawiki/images/8/89/PXL_20220411_120808862.jpg Pic1], [https://wiki.jlab.org/cuawiki/images/1/19/PXL_20220411_120822182.jpg Pic2], [https://wiki.jlab.org/cuawiki/index.php/File:PXL_20220411_120827670.jpg Pic3], [https://wiki.jlab.org/cuawiki/images/1/18/PXL_20220411_121007212.jpg Pic4], [https://wiki.jlab.org/cuawiki/images/4/49/PXL_20220411_121011251.jpg Pic5], [https://wiki.jlab.org/cuawiki/images/f/f4/PXL_20220411_121022788.jpg Pic6]
 +
::* 4 April: [https://wiki.jlab.org/cuawiki/images/3/39/IMG_0162.jpg Pic1], [https://wiki.jlab.org/cuawiki/images/9/99/IMG_0171.jpg Pic2], [https://wiki.jlab.org/cuawiki/images/3/33/IMG_0172.jpg Pic3], [https://wiki.jlab.org/cuawiki/images/d/dc/IMG_0173.jpg Pic4], [https://wiki.jlab.org/cuawiki/images/3/3d/IMG_0174.jpg Pic5], [https://wiki.jlab.org/cuawiki/images/1/13/IMG_0176.jpg Pic6], [https://wiki.jlab.org/cuawiki/images/1/15/IMG_0177.jpg Pic7]
 +
 
 +
* NPS Deck Pictures (March 2022)
 +
::* [https://wiki.jlab.org/cuawiki/images/c/c8/IMG_0097.jpg Pic1], [https://wiki.jlab.org/cuawiki/images/0/05/IMG_0111.jpg Pic2], [https://wiki.jlab.org/cuawiki/images/b/b7/IMG_0112.jpg Pic3]
 +
::* [https://wiki.jlab.org/cuawiki/index.php/File:Deck-Flatness.JPG Drawing deck flatness]
 +
 
 +
* [https://wiki.jlab.org/cuawiki/images/d/d0/NPS_OUTSTANDING_PROJECTS_8-26-2021.pptx Remaining Project Items (8/2021)]
 +
 
 +
=== DAQ/Electronics/Analyzer ===
 +
 
 +
* [https://wiki.jlab.org/cuawiki/index.php/DAQ_in_EEL_108 DAQ in EEL108]
 +
 
 +
* [https://wiki.jlab.org/cuawiki/index.php/Meeting-06232022 Link to DAQ/Electronics/Analyzer activities]; contact David Hamilton for details.
 +
 
 +
* [https://github.com/JeffersonLab/NPSApp GitHub link] (contact Brad, Carlos Y., or Steve W. for access)
 +
 
 +
=== Magnet ===
 +
 
 +
* [https://wiki.jlab.org/cuawiki/images/3/35/SM_BW_June7.pdf Field measured vs. OPERA (6/2021)]
 +
 
 +
=== Crystals ===
 +
 
 +
* Overview of crystal properties
 +
 
 +
::* [https://wiki.jlab.org/cuawiki/images/8/8e/Production_for_J-lab_January_2022.xlsx spreadsheet from CRYTUR (January 2022)] (dimensions, transmittance, light yield, radiation hardness)

Latest revision as of 16:02, 7 February 2023

Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly - COMPLETE (5/27/2022)

  • On site personnel: AANL (Hamlet Mkrtchyan, Vardan Tadevosyan), CUA (Vladimir Berdnikov, Josh Crafts, Petr Stepanov), MSU (Abishek Karki), UIC (ZHeng Huang); onsite contacts: Vladimir, Brad
  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • Crystal Wrapping Documentation

Cabling - COMPLETE (11/18/2022)

  • Onsite contacts: Yeran, Brad
  • Participants
  • AANL (A.Alikhanyan National Science Laboratory)
  • Mkrtchyan Hamlet
  • Voskanyan Hakob
  • Tadevosyan Vardan
  • Mkrtchyan Arthur
  • CUA (Catholic University of America)
  • Ghandilyan Yeranuhi
  • MSU (Mississippi State Universtiy)
  • Abishek Karki
  • OU (Ohio University)
  • Pramita Tiwari
  • GU (University of Glasgow)
  • Oliver Jevons
  • Gary Penman
  • Bundling
  • putting 12 cables on the ground one by one on
  • tying with zip ties in each 3m
  • making a bundle
  • Total number of the cables 2160, total number of the boxes with cables - 180, total number of bundles - 180

Assembly

  • Resources:
  • Overview of the phases of the assembly:
  • crystal stacking - DONE
  • PMT block assembly - DONE
  • Cabling and installation of the big PCBs - DONE
  • preparation for detector checkout - ONGOING
  • detector checkout - February - mid-April 2023
  • Crystal stacking - COMPLETE (10 June 2022)
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
  • All crystals are stacked, sown here with 4 full columns of PMTs and electronics are cabled - assembled NPS picture
  • PMT block assembly - COMPLETE (January 2023)
  • Cabling and installation of the big PCBs - COMPLETE (January 2023)
  • Detector checkout preparations - ONGOING in EEL108
  • onsite personnel: AANL (2), CUA (1-2), ODU (2), OU (2-3); onsite contacts: Simona, Bob, Hakob/Yeran
  • Steps towards performing the detector tests - outside the calorimeter box:
  • Install HV cables, signal cables and LV cables and hooked to the DAQ - COMPLETE (2/7/2023)
  • Set up DAQ
  • Set up power supplies (HV, LV) and slow controls
  • Detector Checkout - PLANNED for February - mid-April 2023 in EEL108

Mechanical

  • Status Updates
  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)

Magnet

Crystals

  • Overview of crystal properties