Task List 2022

  • Link to the Google Doc

Resource List

Pre-assembly - COMPLETE (5/27/2022)

  • On site personnel: AANL (2), CUA (3), MSU (1), UIC (1), DSG (1-2, at the end of May); onsite contacts: Vladimir, Brad
  • Reflector pre-shaping procedure and material
  • Crystal Wrapping Procedure Link
  • Crystal Wrapping Documentation

Assembly

  • Multiple phases:
  • crystal stacking
  • PMT block assembly
  • cabling and installation of the big PCBs
  • preparation for detector checkout
  • detector checkout
  • Crystal stacking - COMPLETE (10 June 2022)
  • onsite personnel: IJCLab-Orsay (6), AANL (2), CUA (2-3), OU (1-2); onsite contacts: Carlos, Vladimir, Brad
  • All crystals are stacked and 4 full columns of PMTs and electronics are cabled - assembled NPS picture
  • Preparation for detector checkout - planned for July/August
  • onsite personnel: AANL (2), CUA (1-2), OU (2-3); onsite contacts: Brad, Julie/Paul, Carlos
  • In order to perform the detector tests, there is work to be done outside the calorimeter box:
  • HV cables, signal cables and LV cables need to be put in place and hooked to the DAQ, which needs to be setup.
  • Power supplies (HV, LV) need to be setup.
  • Same for slow controls (for HV and LED), etc.
  • Detector Checkout - planned for August

Mechanical

  • NPS Deck Pictures (April 2022)
  • NPS Deck Pictures (March 2022)

Magnet

Crystals

  • Overview of crystal properties

DAQ/Electronics/Analyzer

  • GitHub link (contact Brad, Carlos Y., or Steve W. for access)