Difference between revisions of "September 20th, 2022"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
* On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022]. [[media:CPS-Sep-19-2002_Lassiter.pptx | Hall C CPS design]] (''Steven''/''Amy''). [[media:CPS-steady_state_Temps_sep22.pdf | Temperature map calculations]] (''Tim''). [[media:CPS-091922.pdf | Updates on the conceptual design]] (''Vitaly''). ''Rolf'' gave us a preliminary price for Hall C CPS which is $2M. ''Eugene' promised to call Redcon for evaluation. | * On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022]. [[media:CPS-Sep-19-2002_Lassiter.pptx | Hall C CPS design]] (''Steven''/''Amy''). [[media:CPS-steady_state_Temps_sep22.pdf | Temperature map calculations]] (''Tim''). [[media:CPS-091922.pdf | Updates on the conceptual design]] (''Vitaly''). ''Rolf'' gave us a preliminary price for Hall C CPS which is $2M. ''Eugene' promised to call Redcon for evaluation. | ||
− | * ''Eugene'' reported [ | + | * On September 21st, ''Eugene'' reported to the GlueX Collaboration [https://halldweb.jlab.org/DocDB/0057/005745/001/talk_coll_2022_sep.pdf] the KLF budjet for 2023 is $0.4M for Designer’s work, procurement of materials (the collimator cave). |
* Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [https://wiki.jlab.org/klproject/index.php/November,_3rd_2022]. | * Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [https://wiki.jlab.org/klproject/index.php/November,_3rd_2022]. |
Revision as of 11:48, 22 September 2022
Attended: Moskov, Mikhail, Justin, Sean, Jim, and Igor.
- On September 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. Temperature map calculations (Tim). Updates on the conceptual design (Vitaly).
- On September 16th, Tanja Horn had a CPS meeting (main focus is CPS for Hall C)[2].
- On September 19th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3]. Hall C CPS design (Steven/Amy). Temperature map calculations (Tim). Updates on the conceptual design (Vitaly). Rolf gave us a preliminary price for Hall C CPS which is $2M. Eugene' promised to call Redcon for evaluation.
- On September 21st, Eugene reported to the GlueX Collaboration [4] the KLF budjet for 2023 is $0.4M for Designer’s work, procurement of materials (the collimator cave).
- Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [5].