Difference between revisions of "June 13th, 2023"

From kl project
Jump to navigation Jump to search
 
Line 18: Line 18:
 
:* [[media:therm_analysis_mathematica_06_12_2023.pdf | Temperature calculations in Mathematica]] (Hovanes)
 
:* [[media:therm_analysis_mathematica_06_12_2023.pdf | Temperature calculations in Mathematica]] (Hovanes)
 
:* Radiation environment and material budget (''Pavel'')  
 
:* Radiation environment and material budget (''Pavel'')  
:* Radiation environment and material budget (''Vitaly'')
 
 
:* [[media:CPSMEETING061223.pdf | Temperature and  Radiation]] (''Vitaly'')  
 
:* [[media:CPSMEETING061223.pdf | Temperature and  Radiation]] (''Vitaly'')  
  

Latest revision as of 08:35, 14 June 2023

Attended: Moskov, Mikhail, Justin, Sean, Hovasnes, and Igor. Eugine is on vacation. Jim is traveling.

  • Agenda:
  • KLF Conference or Collaboration meeting in Septembr. The decision is to make a collab meeting on September 19.
  • Our preparation for EER-I scheduled for the first week of August (Eugene). We are asking Eugene to clarify a day of ERR-I and who will review us.
  • CPS status (Hovanes)
  • KPT status (Igor and Sean) KPT document
  • KFM status (Mikhail)
  • 128-ns status (Moskov). Sunil Pokharel (Geoff Krafft is advisor) successfully defending his thesis addressed to this task.
  • Engeneering work status (Hovanes)


  • Hovanes said that by January 2025, we have to have ERR-II.


  • On June 12th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].


  • On June 5th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].


  • On June 2nd, Tanja Horn had a CPS meeting (main focus is CPS for Hall C) [3].