* On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022]. [[media:CPS-Sep-19-2002_Lassiter.pptx | Hall C CPS design]]  (''Steven''/''Amy''). [[media:CPS-steady_state_Temps_sep22.pdf | Temperature map calculations]] (''Tim''). [[media:CPS-091922.pdf | Updates on the conceptual design]] (''Vitaly''). ''Rolf'' gave us a preliminary price for Hall C CPS which is $2M. ''Eugene' promised to call Redcon for evaluation.
 
* On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022]. [[media:CPS-Sep-19-2002_Lassiter.pptx | Hall C CPS design]]  (''Steven''/''Amy''). [[media:CPS-steady_state_Temps_sep22.pdf | Temperature map calculations]] (''Tim''). [[media:CPS-091922.pdf | Updates on the conceptual design]] (''Vitaly''). ''Rolf'' gave us a preliminary price for Hall C CPS which is $2M. ''Eugene' promised to call Redcon for evaluation.
  
* On September 21st, ''Eugene'' reported to the GlueX Collaboration [https://halldweb.jlab.org/DocDB/0057/005745/001/talk_coll_2022_sep.pdf] the KLF budjet for 2023 is $0.4M for Designer’s work, procurement of materials (the collimator cave).  
+
* On September 21st, ''Eugene'' reported to the GlueX Collaboration [https://halldweb.jlab.org/DocDB/0057/005745/001/talk_coll_2022_sep.pdf] the KLF budjet for 2023 is $0.4M: Designer’s work, procurement of materials (the collimator cave). The KLF installation is scheduled for 2025-2026 and we will run 2026-2028.
  
  
 
* Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [https://wiki.jlab.org/klproject/index.php/November,_3rd_2022].
 
* Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [https://wiki.jlab.org/klproject/index.php/November,_3rd_2022].

Revision as of 11:51, 22 September 2022

Attended: Moskov, Mikhail, Justin, Sean, Jim, and Igor.

  • On September 16th, Tanja Horn had a CPS meeting (main focus is CPS for Hall C)[2].
  • On September 21st, Eugene reported to the GlueX Collaboration [4] the KLF budjet for 2023 is $0.4M: Designer’s work, procurement of materials (the collimator cave). The KLF installation is scheduled for 2025-2026 and we will run 2026-2028.


  • Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [5].