September 20th, 2022
Jump to navigation
Jump to search
Attended: Moskov, Mikhail, Justin, Sean, Jim, and Igor.
- On September 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [1]. Temperature map calculations (Tim). Updates on the conceptual design (Vitaly).
- On September 16th, Tanja Horn had a CPS meeting (main focus is CPS for Hall C)[2].
- On September 19th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3]. Hall C CPS design (Steven/Amy). Temperature map calculations (Tim). Updates on the conceptual design (Vitaly). Rolf gave us a preliminary price for Hall C CPS which is $2M. Eugene' promised to call Redcon for evaluation.
- On September 21st, Eugene reported to the GlueX Collaboration [4] the KLF budjet for 2023 is $0.4M: Designer’s work, procurement of materials (the collimator cave). The KLF installation is scheduled for 2025-2026 and we will run KLF in 2026-2028.
- Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [5].