Difference between revisions of "PRad Experiment Readiness Review"
From Pcrewiki
Jump to navigationJump to searchLine 44: | Line 44: | ||
*[https://wiki.jlab.org/pcrewiki/images/5/5d/PRad-Physics_HGao.pdf Physics goals of PRad experiment] | *[https://wiki.jlab.org/pcrewiki/images/5/5d/PRad-Physics_HGao.pdf Physics goals of PRad experiment] | ||
*[https://wiki.jlab.org/pcrewiki/images/1/1e/Gasparian_Red_Review_Nov_12_2015.pdf Overview of the experimental setup] | *[https://wiki.jlab.org/pcrewiki/images/1/1e/Gasparian_Red_Review_Nov_12_2015.pdf Overview of the experimental setup] | ||
− | *https://wiki.jlab.org/pcrewiki/images/2/23/PRAD_ERR_Installation.pdf Coexistence with CLAS12 project] | + | *[https://wiki.jlab.org/pcrewiki/images/2/23/PRAD_ERR_Installation.pdf Coexistence with CLAS12 project] |
*[https://wiki.jlab.org/pcrewiki/images/d/d1/PRadTargetReviewSlides.pdf Target] | *[https://wiki.jlab.org/pcrewiki/images/d/d1/PRadTargetReviewSlides.pdf Target] | ||
*[https://wiki.jlab.org/pcrewiki/images/9/91/KG_pRadReadinessReview_20151112.pdf GEM and DAQ integration] | *[https://wiki.jlab.org/pcrewiki/images/9/91/KG_pRadReadinessReview_20151112.pdf GEM and DAQ integration] |
Revision as of 16:54, 10 November 2015
The review will take place November 12, 2015 at 8:30 am in L102
Agenda
- 8:30 Executive Session
- 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
- 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
- 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
- 10:15 Coffee Break
- 10:30 Target: parameters, safety (20 min) - Chris Keith
- 10:50 GEM and DAQ integration (20 min) - Kondo Gnanvo
- 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
- 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
- 12:00 PRad Beam Commissioning and Procedures (20 min) - Arne Freyberger
- 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar Dutta
- 12:50 Lunch
- 13:30 Executive Session
- 15:30 Closeout
Materials for ERR
Presentations
- Physics goals of PRad experiment
- Overview of the experimental setup
- Coexistence with CLAS12 project
- Target
- GEM and DAQ integration
- DAQ, on-line and off-line software
- Engineering aspects
- PRad Beam Commissioning and Procedures
- Run Documentation
Documentation
- Proposal of the E12-11-106 (PRad) experiment
- Schedules
- Target
- Vacuum vessel
- Run documentation