* Create new Installation and Commissioning plan here.
 
* Create new Installation and Commissioning plan here.
  
=[[Installation and Configuration]]=
+
=[[New Installation and Configuration]]=
  
 
=With First Beam (2019-09-04 - 2019-09-10)=
 
=With First Beam (2019-09-04 - 2019-09-10)=
Line 13: Line 13:
 
<li> Beamline
 
<li> Beamline
 
  <ol>
 
  <ol>
   <li> [[Beam Centering]]
+
   <li> [[Beam Centering]] (standard)
   <li> [[Raster Size Calibration]]
+
   <li> [[Raster Size Calibration]] (standard)
   <li> [[BPM Calibration]] (pedestal run, Bullseye scan)
+
   <li> [[ARC Energy Measurement]] (standard, parasitic only)
   <li> [[ARC Energy Measurement]] (parasitic only)
+
  <li> [[Fall-2018 BPM Calibration]] (pedestal run, Bullseye scan, [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration])  
 +
   <li> [[BCM ]]
 +
 
 +
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (standard)
 +
<ol>
 +
<li> [[Fall-2018 SRC DAQ and Trigger Checkout]]
 +
<li> [[Fall-2018 ee'K DAQ and Trigger Checkout]]
 
  </ol>
 
  </ol>
  
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (regular)
+
<li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] (standard)
 +
<ol>
 +
<li> [[Fall-2018 Aerogel Cherenkov Detector Checkout]]
 +
<li> [[Fall-2018 Gas Cherenkov Detector Checkout]]
 +
</ol>
  
<li> [[New Trigger Checkout]]
+
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) (standard)
 
+
<ol>
<li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] (regular)
+
<li> [[Fall-2018 Aerogel Cherenkov Detector Calibration]]
<li> [[New Detector / Optics Checkout]]
+
<li> [[Fall-2018 Gas Cherenkov Detector Calibration]]
 
+
</ol>
<li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) (regular)
 
  
<li> [[New Detector Calibration]]
+
<li> [[Fall-2018 Target Boiling Study]]
 +
<li> [[src Raster Calibration]] (standard)
  
 
</ol>
 
</ol>