Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
(Created page with "* We can adapt the list tasks during the [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning Spring 2018 run]") |
|||
(27 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | * We can | + | [https://wiki.jlab.org/tegwiki/index.php/Main_Page <B>Back to Tritium-Main</B>] |
+ | [https://wiki.jlab.org/tegwiki/index.php/2018_Fall_Run <B>Back to 2018 Fall Run Plan</B>] | ||
+ | |||
+ | * We can link to the list tasks during the [https://wiki.jlab.org/tegwiki/index.php/Additional_Installation_and_Commissioning Spring 2018 run] | ||
+ | * Create new Installation and Commissioning plan here. | ||
+ | |||
+ | =[[New Installation and Configuration]]= | ||
+ | |||
+ | =With First Beam (2019-09-04 - 2019-09-10)= | ||
+ | |||
+ | <ol> | ||
+ | |||
+ | <li> Beamline | ||
+ | <ol> | ||
+ | <li> [[Beam Centering]] (standard) | ||
+ | <li> [[Raster Size Calibration]] (standard) | ||
+ | <li> [[ARC Energy Measurement]] (standard, parasitic only) | ||
+ | <li> [[Fall-2018 BPM Calibration]] (pedestal run, Bullseye scan, [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration]) | ||
+ | <li> [[BCM ]] | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (standard) | ||
+ | <ol> | ||
+ | <li> [[Fall-2018 SRC DAQ and Trigger Checkout]] | ||
+ | <li> [[Fall-2018 ee'K DAQ and Trigger Checkout]] | ||
+ | </ol> | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] (standard) | ||
+ | <ol> | ||
+ | <li> [[Fall-2018 Aerogel Cherenkov Detector Checkout]] | ||
+ | <li> [[Fall-2018 Gas Cherenkov Detector Checkout]] | ||
+ | </ol> | ||
+ | |||
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) (standard) | ||
+ | <ol> | ||
+ | <li> [[Fall-2018 Aerogel Cherenkov Detector Calibration]] | ||
+ | <li> [[Fall-2018 Gas Cherenkov Detector Calibration]] | ||
+ | </ol> | ||
+ | |||
+ | <li> [[Fall-2018 Target Boiling Study]] | ||
+ | <li> [[src Raster Calibration]] (standard) | ||
+ | |||
+ | </ol> |
Latest revision as of 09:42, 24 October 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
New Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering (standard)
- Raster Size Calibration (standard)
- ARC Energy Measurement (standard, parasitic only)
- Fall-2018 BPM Calibration (pedestal run, Bullseye scan, See Spring2018 BPM Calibration)
- BCM
- DAQ and Trigger Checkout (standard)
- Detector Checkout / Optics (standard)
- Detector Calibrations (in parallel with other activities once we have the electron data) (standard)
- Fall-2018 Target Boiling Study
- src Raster Calibration (standard)