Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
(13 intermediate revisions by 2 users not shown) | |||
Line 16: | Line 16: | ||
<li> [[Raster Size Calibration]] (standard) | <li> [[Raster Size Calibration]] (standard) | ||
<li> [[ARC Energy Measurement]] (standard, parasitic only) | <li> [[ARC Energy Measurement]] (standard, parasitic only) | ||
− | <li> [[Fall-2018 BPM Calibration]] [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration] | + | <li> [[Fall-2018 BPM Calibration]] (pedestal run, Bullseye scan, [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration]) |
− | + | <li> [[BCM ]] | |
− | <li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] ( | + | <li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (standard) |
<ol> | <ol> | ||
− | <li> [[ | + | <li> [[Fall-2018 SRC DAQ and Trigger Checkout]] |
− | <li> [[ | + | <li> [[Fall-2018 ee'K DAQ and Trigger Checkout]] |
</ol> | </ol> | ||
− | <li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] ( | + | <li> [https://wiki.jlab.org/tegwiki/index.php/Detector_Checkout_with_single_foil,_multi_foils,_and_target_cells Detector Checkout / Optics] (standard) |
<ol> | <ol> | ||
− | <li> [[Aerogel Cherenkov Detector Checkout]] | + | <li> [[Fall-2018 Aerogel Cherenkov Detector Checkout]] |
− | <li> [[Gas Cherenkov Detector | + | <li> [[Fall-2018 Gas Cherenkov Detector Checkout]] |
− | |||
</ol> | </ol> | ||
− | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) ( | + | |
+ | <li> [https://wiki.jlab.org/tegwiki/index.php/HRS_Detector_Checkout_and_Calibration Detector Calibrations] (in parallel with other activities once we have the electron data) (standard) | ||
<ol> | <ol> | ||
− | <li> [[Aerogel Cherenkov Detector Calibration]] | + | <li> [[Fall-2018 Aerogel Cherenkov Detector Calibration]] |
− | <li> [[Gas Cherenkov Detector Calibration]] | + | <li> [[Fall-2018 Gas Cherenkov Detector Calibration]] |
</ol> | </ol> | ||
<li> [[Fall-2018 Target Boiling Study]] | <li> [[Fall-2018 Target Boiling Study]] | ||
+ | <li> [[src Raster Calibration]] (standard) | ||
+ | |||
</ol> | </ol> |
Latest revision as of 09:42, 24 October 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
New Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering (standard)
- Raster Size Calibration (standard)
- ARC Energy Measurement (standard, parasitic only)
- Fall-2018 BPM Calibration (pedestal run, Bullseye scan, See Spring2018 BPM Calibration)
- BCM
- DAQ and Trigger Checkout (standard)
- Detector Checkout / Optics (standard)
- Detector Calibrations (in parallel with other activities once we have the electron data) (standard)
- Fall-2018 Target Boiling Study
- src Raster Calibration (standard)