Difference between revisions of "Fall Installation and Commissioning"

From Tritium Experiments Group
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:
 
   <li> [[ARC Energy Measurement]] (standard, parasitic only)
 
   <li> [[ARC Energy Measurement]] (standard, parasitic only)
 
   <li> [[Fall-2018 BPM Calibration]] (pedestal run, Bullseye scan, [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration])  
 
   <li> [[Fall-2018 BPM Calibration]] (pedestal run, Bullseye scan, [https://wiki.jlab.org/tegwiki/index.php/BPM_Calibration See Spring2018 BPM Calibration])  
   <li> [[BCM Calibration Runs]]
+
   <li> [[BCM ]]
  
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (standard)
 
<li> [https://wiki.jlab.org/tegwiki/index.php/Data_Acquisition_System_and_Triggers DAQ and Trigger Checkout] (standard)
Line 38: Line 38:
  
 
<li> [[Fall-2018 Target Boiling Study]]
 
<li> [[Fall-2018 Target Boiling Study]]
 +
<li> [[src Raster Calibration]] (standard)
 +
 
</ol>
 
</ol>

Latest revision as of 10:42, 24 October 2018