Difference between revisions of "Fall Installation and Commissioning"
Jump to navigation
Jump to search
Line 38: | Line 38: | ||
<li> [[Fall-2018 Target Boiling Study]] | <li> [[Fall-2018 Target Boiling Study]] | ||
+ | <li> [[src Raster Calibration]] (standard) | ||
− | |||
</ol> | </ol> |
Latest revision as of 09:42, 24 October 2018
Back to Tritium-Main Back to 2018 Fall Run Plan
- We can link to the list tasks during the Spring 2018 run
- Create new Installation and Commissioning plan here.
New Installation and Configuration
With First Beam (2019-09-04 - 2019-09-10)
- Beamline
- Beam Centering (standard)
- Raster Size Calibration (standard)
- ARC Energy Measurement (standard, parasitic only)
- Fall-2018 BPM Calibration (pedestal run, Bullseye scan, See Spring2018 BPM Calibration)
- BCM
- DAQ and Trigger Checkout (standard)
- Detector Checkout / Optics (standard)
- Detector Calibrations (in parallel with other activities once we have the electron data) (standard)
- Fall-2018 Target Boiling Study
- src Raster Calibration (standard)