Hypernuclear CollaborationMeeting 2022Dec

From Tritium Experiments Group
Jump to navigation Jump to search

JLab Hypernuclear Collaboration Meeting 2022

  • December 13-14, 2022
  • Online
  • Participants: Nagao, Nue, Bishnu, Daigo, Franco, Hamlet, Joerg, Josef, Kazuki, Koga, Lassiter, Mark, Metzger, Masashi, Mizuno, Mitra, Patrick, Pete, Ryoko, Steve, Takeru, Liguang, Tatsuhiro, Guido, Victor, Yu, Nagano, Toshi, +

December 13, 2022

Time Table (Dec 13, 2022). Chair = J. Reinhold (FIU)
Time (EST) Time (CET) Time (JST) Speaker Title File
07:00-07:30 13:00-13:30 21:00-21:30 S.N. Nakamura (Univ. Tokyo) Opening + Introduction PDF
07:30-08:00 13:30-14:00 21:30-22:00 M. Jones (JLab) Hall Status and Plan PDF
08:00-08:20 14:00-14:20 22:00-22:20 T. Gogami (Kyoto Univ.) Status / activity summary PDF
08:20-08:40 14:20-14:40 22:20-22:40 S. Nagao (Univ. Tokyo) Modification summary, Hall A to Hall C PDF
08:40-09:00 14:40-15:00 22:40-23:00 S. Lassiter (JLab) Hall design for hypernuclear experiment PDF
09:00-09:30 15:00-15:30 23:00-23:30 Discussion

December 14, 2022

Time Table (Dec 14, 2022). Chair = P. Markowitz (FIU)
Time (EST) Time (CET) Time (JST) Speaker Title File
07:00-07:20 13:00-13:20 21:00-21:20 Ishige (Tohoku Univ.) MC simulation study for future experiment PDF
07:20-07:40 13:20-13:40 21:20-21:40 G.M. Urciuoli (INFN) Experiment for Pb target PDF
07:40-08:00 13:40-14:00 21:40-22:00 B. Pandey (VMI) Commissioning of aeregel Cherekov counters for HKS PDF
08:00-08:20 14:00-14:20 22:00-22:20 Okuyama (Tohoku Univ.) Λ and Σ0 production (E12-17-003) PDF
08:20-08:40 14:20-14:40 22:20-22:40 Akiyama (Tohoku Univ.) η' production (E12-17-003) PDF
08:40-09:00 14:40-15:00 22:40-23:00 Discussion
09:00-09:10 15:00-15:10 23:00-23:10 Summary and closing

Previous meeting

December 7-9th, 2021


Reference

JLab Hypernuclear Request2022.pdf


Contact to get Zoom information

Toshi Gogami (gogami.toshiyuki.4a _at kyoto-u.ac.jp)

Note

1st day

  • Target
    • Manpower for the design may be difficult to assign until Moller target work
      → Mark will check and try to arrange it.
    • Ca target may need to be purchased.
      → Mark will double check with Dave.
  • Power supply for PCS (2 large + 2 small)
    → will be checked.
  • Shielding blocks
    → some blocks are lacking.
  • Radiation budget
    • Once the experimental layout is drawn,
      the calculation can be done.
      (we are grateful for large effort on making the layout by Steven Lassiter!)
  • Electronics
    • Need to know the latest situation.
    • Mark will let Nue and Toshi know the contact person about DAQ.