Search results

Jump to navigation Jump to search
  • * Measure B vs. I at center of magnet using the EPICS hysteresis cycle at the beginning then top down t
    1 KB (208 words) - 11:36, 29 October 2020
  • 3. Send beam and center it on viewers 5D00 and 5D01 by adjusting MDL0L02 and vertical correctors in * Send beam and center it on viewers 5D00 and 5D01 by adjusting MDL0L02 and vertical correctors in
    3 KB (497 words) - 15:37, 11 September 2015
  • **John Seeman, Chair - Stanford Linear Accelerator Center
    2 KB (209 words) - 10:57, 3 December 2021
  • - Distance from center of beam pipe to injector floor: 42 inches - Distance from center of beam pipe to Step: 27 inches
    3 KB (569 words) - 12:07, 7 December 2013
  • ...harmonic, so only one tuner (per side) is needed to un-insert/ insert the center coax. Also, in the sbir I showed two of these, nose to nose. This would a
    2 KB (255 words) - 12:29, 4 January 2017
  • # Still trying to center the gun solenoid
    1 KB (233 words) - 10:26, 22 March 2017
  • ::GPT model puts FY solenoids at Jay's TN center lines -/+ 9.8425 cm, should/can they be different?
    2 KB (260 words) - 16:21, 5 February 2020
  • ...harmonic, so only one tuner (per side) is needed to un-insert/ insert the center coax. Also, in the sbir I showed two of these, nose to nose. This would a
    2 KB (255 words) - 12:22, 4 January 2017
  • [[Image:detector_photos_130204.jpg|thumb|center|100px|alt=Mott detector.]]
    1 KB (143 words) - 14:52, 6 February 2013
  • *** [[media:20240116_uitf_r28_solenoid.pdf|Orbits extrapolated from solenoid center]] giving 15--20 cm focal length
    3 KB (452 words) - 21:34, 16 January 2024
  • :: big solenoid center is at Z 27.4 cm. :: first focusing solenoid center is Z 56.5 cm
    9 KB (1,292 words) - 14:16, 5 March 2018
  • ;Room A110, CEBAF Center
    2 KB (218 words) - 14:33, 26 April 2018
  • ** The top hat flange is being evaluated. The center port will have the top heater, but a short nipple is being made to ensure t
    2 KB (312 words) - 14:30, 20 October 2015
  • ...e Injector Tunnel, Injector Service Building (ISB) and the Machine Control Center (MCC): [[media:JLab_sketch.pdf]] [[media:JLab_sketch.pptx]]
    2 KB (239 words) - 13:34, 20 May 2014
  • {| class="wikitable" style="text-align: center; width: 50%;" style="background: white;" |colspan="4"|<center><b>[[2021-08-25|Next Meeting: Aug 25]]</b></center>
    2 KB (217 words) - 18:38, 9 September 2021
  • ...o z=0.5m? - need same kicks on both correctors so that the beam returns to center
    2 KB (261 words) - 11:37, 23 March 2020
  • ...cathode electrode misalignment, the Haimson coils are not strong enough to center (H) the beam on the solenoid.
    2 KB (345 words) - 14:00, 31 May 2016
  • ...4 inches. This will allow the heater to lower 0.5 inches below the chamber center line, and with the 70 m stroke, the heater will clear the manipulator for t
    2 KB (356 words) - 08:19, 29 October 2015
  • #Reza say how far apart he'd like the chopper solenoids spaced from chopper center to minimize/eliminate B-field (helpful to say for both the 3.99" and 4.62"
    2 KB (322 words) - 09:44, 13 June 2019
  • ...with S&A group to set upper mcallister CF "flat", find X/Z micrometers to center target, and motor to calibrate Y position relative to a home
    2 KB (292 words) - 21:11, 29 June 2021

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)