Difference between revisions of "Bubble Chamber Reviews"

From Ciswikidb
Jump to navigation Jump to search
Line 17: Line 17:
 
## [[media:Rev-resp.pdf]]
 
## [[media:Rev-resp.pdf]]
 
# '''''Approved TOSP (with signatures and all other documents):''''' [[media:operational_safety_procedure_form_52757.pdf]]
 
# '''''Approved TOSP (with signatures and all other documents):''''' [[media:operational_safety_procedure_form_52757.pdf]]
# Industrial Hygiene report for sampling conducted on 9/9/2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: [[media:Bubble_Bhamber_AirSAmplingResults.pdf]]
+
# Industrial Hygiene report for sampling conducted on September 9, 2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: [[media:Bubble_Bhamber_AirSAmplingResults.pdf]]
  
  

Revision as of 14:44, 17 September 2015

Bubble Chamber Reviews at JLab

  • Bubble Chamber TOSP Review (August 18, 2015):
  1. Charge to the Committee: Bubble Chamber Safety Review (P. Rossi): media:Bubble-Chamber_Review_Charge.pdf media:Bubble-Chamber_Review_Charge.ppt
  2. Presentations:
    1. Experimental Overview (R. Suleiman): media:Bubble_Chamber_TOSP_Overview_Aug2015.pdf media:Bubble_Chamber_TOSP_Overview_Aug2015.pptx
    2. Bubble Chamber Superheated Detector System (D. Meekins): media:Bubble_Chamber_Safety_Meekins.pdf media:Bubble_Chamber_Safety_Meekins.pptx
  3. Temporary Operational Safety Procedure (TOSP):
    1. TOSP Form: media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.pdf media:TOSP_Test_of_ANL_Bubble_Chamber_Detector.docx
    2. TOPS Procedural Document: media:TOSP_Procedural_Document_Bubble_Chamber.pdf media:TOSP_Procedural_Document_Bubble_Chamber.docx
  4. Report from the Review Committee: media:Bubble_Chamber_Experiment_Readiness_Review.pdf
  5. Final Operational Safety Documents Submitted for Signatures (#52757):
    1. media:Procedure-TOSP-Aug.pdf
    2. media:THA-ANL_bubble_chamber.pdf
    3. media:TGT-PROC-15-001.pdf
    4. media:TGT-CALC-502-002.pdf
    5. media:TGT502-1000-0000-PID.pdf
    6. media:Rev-resp.pdf
  6. Approved TOSP (with signatures and all other documents): media:operational_safety_procedure_form_52757.pdf
  7. Industrial Hygiene report for sampling conducted on September 9, 2015 while the bubble chamber was filled with nitrous oxide in the Injector Tunnel: media:Bubble_Bhamber_AirSAmplingResults.pdf




Bubble Chamber Reviews at ANL

  • ANL Bubble Chamber Superheated Active Target System

B. DiGiovine, Argonne National Lab (2015) media:Bubble_Chamber_ANL_Safety_Review-R2.pdf media:Bubble_Chamber_ANL_Safety_Review-R2.ppt


  • Bubble Chamber: Safety and Systems Overview

B. DiGiovine, Argonne National Lab (2012) media:H2O_Bubble_Chamber-Safety_Review.pdf




Bubble Chamber Dimensions



Installation Schedule



Injector Drawings



Survey Transmittals