Difference between revisions of "NPS Subsystems"
Jump to navigation
Jump to search
Line 104: | Line 104: | ||
== NPS Assembly preparations == | == NPS Assembly preparations == | ||
* NPS reflector (ESR) preshaping procedure | * NPS reflector (ESR) preshaping procedure | ||
− | [https://wiki.jlab.org/cuawiki/index.php/File:ESR_preshaping.pdf ESR preshaping] | + | ::* [https://wiki.jlab.org/cuawiki/index.php/File:ESR_preshaping.pdf ESR preshaping] |
Revision as of 10:04, 24 November 2020
NPS Layout
- NPS layout images (2019)
- Initial cabling evaluation (2016)
- Beam pipe considerations (2013)
NPS Magnet
- Assembly (2018-2019)
- Photo 1 (March 2019)
- Construction updates
- March 2017
- Main coil (November 2017)
- Background studies (2016)
- Vertical vs horizontal field
- Effect of field on PMTs
- Shielding concept
- Fringe field considerations (2016)
- Summary impact on HMS optics
- Minimum aperture layout (2016)
- Initial calculations (2015)
Calorimeter
- Frame
- Crystals
- Specifications
- Shape and dimensions
- Raw material analysis
- Testing facilities: CUA, Orsay, Giessen
- Characterization results
- PMTs and HV dividers
- Socket modification for 100 articles (2017)
- Tests with laser, long cable runs, fADC (2017)
- NPS prototype studies
- 3x3 prototype report (2019)
- Updates from test run and calibrations (Spring 2018)
- 12x12 array (NPS prototype/ComCal) - password required
- Initial design concepts LMS and Curing and 3x3 prototype (2013-2014)
- Initial component studies
- Background radiation dose at calorimeter (2016)
- Crystal temperature dependence (2015)
- Irradiation crystals at JLab,Idaho, and Caltech (2014-2015)
- LED studies - PMT sensitivity (2014)
DAQ and Trigger
- Initial equipment count and rate estimates (2017)
Controls
Data Analysis
Monte Carlo
- NPS Geant4 simulation for Hall C DVCS - GitHub: use DVCS_evt_gen/.
Experiments
- WACS (E12-14-003, E12-14-005)
- TCS (C12-18-005)
NPS Assembly preparations
- NPS reflector (ESR) preshaping procedure
::* ESR preshaping