Difference between revisions of "NPS Subsystems"

From Cuawiki
Jump to navigation Jump to search
Line 79: Line 79:
 
::* LED studies - PMT sensitivity (2014)
 
::* LED studies - PMT sensitivity (2014)
  
* Crystal and PMT serial numbers as currently stacked in the calorimeter: [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx .xlsx], [toot .pdf]
+
* Crystal and PMT serial numbers as currently stacked in the calorimeter: [https://wiki.jlab.org/cuawiki/images/a/a9/02_Crystals_PMT_Mounting_View_BACK.xlsx .xlsx], [https://wiki.jlab.org/cuawiki/images/1/1d/02_Crystals_PMT_Mounting_View_BACK.pdf .pdf]
  
 
* [[Media:NPS_Cable_mapping.xlsx|Cable Mapping and Crystal-to-FADC table]]
 
* [[Media:NPS_Cable_mapping.xlsx|Cable Mapping and Crystal-to-FADC table]]

Revision as of 21:55, 10 March 2023

NPS Layout

  • NPS detector carriage assembly (2021)

NPS Magnet

  • Magnet Power Supply requirements:
  • PSU with current greater than 1,100A for some overhead
  • No need for a polarity switch, either for the run or for testing. Simple enough to mechanically swap the leads if needed for testing
  • Assembly (2018-2019)
  • Construction updates
  • Vertical vs horizontal field
  • Effect of field on PMTs
  • Shielding concept
  • Fringe field considerations (2016)

Calorimeter

  • Frame
  • Crystals
  • PMTs and HV dividers
  • High Voltage cables fabrication and testing
  • CAEN HV system testing
  • NPS prototype studies
  • 3x3 prototype report (2019)
  • Initial component studies
  • LED studies - PMT sensitivity (2014)
  • Crystal and PMT serial numbers as currently stacked in the calorimeter: .xlsx, .pdf

DAQ and Trigger

  • Initial equipment count and rate estimates (2017)

Controls

  • Control and monitoring screens development
  • Interlock system

Data Analysis

Monte Carlo

Experiments

NPS Assembly preparations