Difference between revisions of "September 20th, 2022"
Jump to navigation
Jump to search
(16 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | <b>Attended</b>: | + | <b>Attended</b>: ''Moskov'', ''Mikhail'', ''Justin'', ''Sean'', ''Jim'', and ''Igor''. |
+ | |||
+ | |||
+ | * JLUO input to the LRP process (draft) [https://wiki.jlab.org/cugwiki/index.php/JLUO_input_to_the_LRP_process_(draft)] following JLUO meeting on September 8th [https://indico.jlab.org/event/589/]: ''Embraces with <font color=blue>the highest priority </font> the scientific capitalization of investments made at CEBAF, the nation’s premier QCD facility, and strongly supports optimal running of the 12 GeV program, including the construction of the SOLID detector, the development of a positron beam, the luminosity upgrade of the CLAS12 detector and <font color=blue>the implementation of a secondary KL beam</font>.'' | ||
+ | |||
* On September 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_12,_2022]. [[media:CPS_temp_calcs_09_12_22.pdf | Temperature map calculations]] (''Tim''). [[media:CSP_update_09_12_22.pdf | Updates on the conceptual design]] (''Vitaly''). | * On September 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_12,_2022]. [[media:CPS_temp_calcs_09_12_22.pdf | Temperature map calculations]] (''Tim''). [[media:CSP_update_09_12_22.pdf | Updates on the conceptual design]] (''Vitaly''). | ||
Line 5: | Line 9: | ||
* On September 16th, ''Tanja Horn'' had a ''CPS'' meeting (main focus is CPS for Hall C)[https://wiki.jlab.org/cuawiki/index.php/Meeting_16_September_2022]. | * On September 16th, ''Tanja Horn'' had a ''CPS'' meeting (main focus is CPS for Hall C)[https://wiki.jlab.org/cuawiki/index.php/Meeting_16_September_2022]. | ||
− | * On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022]. [[media:CPS-Sep-19-2002_Lassiter.pptx | Hall C CPS design]] (''Steven''/''Amy'') [[ | Temperature map calculations]] (''Tim''). [[ | Updates on the conceptual design]] (''Vitaly''). | + | * On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022]. [[media:CPS-Sep-19-2002_Lassiter.pptx | Hall C CPS design]] (''Steven''/''Amy''). [[media:CPS-steady_state_Temps_sep22.pdf | Temperature map calculations]] (''Tim''). [[media:CPS-091922.pdf | Updates on the conceptual design]] (''Vitaly''). ''Rolf'' gave us a preliminary price for Hall C CPS which is $2M. ''Eugene' promised to call Redcon for evaluation. |
+ | |||
+ | |||
+ | * On September 21st, ''Eugene'' reported to the GlueX Collaboration [https://halldweb.jlab.org/DocDB/0057/005745/001/talk_coll_2022_sep.pdf] the KLF budjet for 2023 is $0.4M: Designer’s work, procurement of materials (the collimator cave). The KLF installation is scheduled for 2025-2026 and we will run KLF in 2026-2028. | ||
* Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [https://wiki.jlab.org/klproject/index.php/November,_3rd_2022]. | * Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [https://wiki.jlab.org/klproject/index.php/November,_3rd_2022]. |
Latest revision as of 12:05, 22 September 2022
Attended: Moskov, Mikhail, Justin, Sean, Jim, and Igor.
- JLUO input to the LRP process (draft) [1] following JLUO meeting on September 8th [2]: Embraces with the highest priority the scientific capitalization of investments made at CEBAF, the nation’s premier QCD facility, and strongly supports optimal running of the 12 GeV program, including the construction of the SOLID detector, the development of a positron beam, the luminosity upgrade of the CLAS12 detector and the implementation of a secondary KL beam.
- On September 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [3]. Temperature map calculations (Tim). Updates on the conceptual design (Vitaly).
- On September 16th, Tanja Horn had a CPS meeting (main focus is CPS for Hall C)[4].
- On September 19th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [5]. Hall C CPS design (Steven/Amy). Temperature map calculations (Tim). Updates on the conceptual design (Vitaly). Rolf gave us a preliminary price for Hall C CPS which is $2M. Eugene' promised to call Redcon for evaluation.
- On September 21st, Eugene reported to the GlueX Collaboration [6] the KLF budjet for 2023 is $0.4M: Designer’s work, procurement of materials (the collimator cave). The KLF installation is scheduled for 2025-2026 and we will run KLF in 2026-2028.
- Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [7].