Difference between revisions of "PRad Experiment Readiness Review"
From Pcrewiki
Jump to navigationJump to search (→Agenda) |
|||
Line 1: | Line 1: | ||
+ | ='''The review will take place March 25, 2016 at 8:30 in L102'''= | ||
+ | ==Agenda== | ||
− | '''The review will take place November 12, 2015 at 8:30 am in L102''' | + | |
+ | ==Documents== | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ='''The review will take place November 12, 2015 at 8:30 am in L102'''= | ||
*[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe] | *[https://wiki.jlab.org/pcrewiki/images/c/c8/PRad_Experiment_Readiness_Review_Committee.pdf Review committe] | ||
Line 9: | Line 17: | ||
− | =[https://wiki.jlab.org/pcrewiki/images/d/d7/Preliminary_Agenda_Nov_12_2015_v4.pdf Agenda]= | + | ==[https://wiki.jlab.org/pcrewiki/images/d/d7/Preliminary_Agenda_Nov_12_2015_v4.pdf Agenda]== |
Line 38: | Line 46: | ||
− | ==[https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf Final Report]== | + | ===[https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf Final Report]=== |
=Materials for ERR= | =Materials for ERR= |
Revision as of 09:00, 18 March 2016
The review will take place March 25, 2016 at 8:30 in L102
Agenda
Documents
The review will take place November 12, 2015 at 8:30 am in L102
Agenda
- 8:30 Executive Session
- 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
- 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
- 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
- 10:15 Coffee Break
- 10:30 Target: parameters, safety (20 min) - Chris Keith
- 10:50 GEM and DAQ integration (20 min) - Kondo Gnanvo
- 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
- 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
- 12:00 PRad Beam Commissioning and Procedures (20 min) - Mike Spata
- 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar Dutta
- 12:50 Lunch
- 13:30 Executive Session
- 15:30 Closeout
Final Report
Materials for ERR
Presentations
- Physics goals of PRad experiment
- Overview of the experimental setup
- Coexistence with CLAS12 project
- Target
- GEM and DAQ integration
- DAQ, on-line and off-line software
- Engineering aspects
- PRad Beam Commissioning and Procedures
- Run Documentation
Documentation
- Proposal of the E12-11-106 (PRad) experiment
- Schedules
- Target
- Vacuum vessel
- Run documentation