Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
Line 26: Line 26:
 
* '''11:10''' [https://wiki.jlab.org/pcrewiki/images/e/e7/DAQ_and_software.pdf DAQ, on-line and off-line software] (20 min) - ''Chao Peng''
 
* '''11:10''' [https://wiki.jlab.org/pcrewiki/images/e/e7/DAQ_and_software.pdf DAQ, on-line and off-line software] (20 min) - ''Chao Peng''
 
* '''11:30''' [https://wiki.jlab.org/pcrewiki/images/d/db/PRad_ERR_Design_and_Engineering.pdf Engineering aspects: beam line, vacuum vessel, window, installation, safety] (30 min) - ''Bob Miller''
 
* '''11:30''' [https://wiki.jlab.org/pcrewiki/images/d/db/PRad_ERR_Design_and_Engineering.pdf Engineering aspects: beam line, vacuum vessel, window, installation, safety] (30 min) - ''Bob Miller''
* '''12:00''' PRad Beam Commissioning and Procedures (20 min) - ''Mike Spata''
+
* '''12:00'''[https://wiki.jlab.org/pcrewiki/images/5/51/ERR_PRad_Beamline.pdf PRad Beam Commissioning and Procedures] (20 min) - ''Mike Spata''
 
* '''12:20'''[https://wiki.jlab.org/pcrewiki/images/a/a5/Prad_hazana.pdf Run documentation COO, ESAD, RSAD, etc.] (30 min) - ''Dipangkar Dutta''
 
* '''12:20'''[https://wiki.jlab.org/pcrewiki/images/a/a5/Prad_hazana.pdf Run documentation COO, ESAD, RSAD, etc.] (30 min) - ''Dipangkar Dutta''
 
** [https://wiki.jlab.org/pcrewiki/images/c/c1/COO_HallB-PRAD.pdf PRad Conduct of Operations Document (COO)]
 
** [https://wiki.jlab.org/pcrewiki/images/c/c1/COO_HallB-PRAD.pdf PRad Conduct of Operations Document (COO)]

Revision as of 10:11, 11 November 2015


The review will take place November 12, 2015 at 8:30 am in L102



Agenda

  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout

Materials for ERR

Presentations

Documentation