Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
Line 18: Line 18:
 
* '''12:15'''      Closeout
 
* '''12:15'''      Closeout
  
[*]  - items of the previous committee report covered in the presentation
+
[*]  - items of the [https://wiki.jlab.org/pcrewiki/images/8/88/PRad_ERR_final.pdf  previous committee report] covered in the presentation
  
 
==Documents==
 
==Documents==

Revision as of 09:55, 21 March 2016


The review will take place March 25, 2016 at 9:00 in L102

Final Report from Previous Round

Agenda

  • 9:00 Executive Session /10 min/
  • 9:10 Equipment and installation status, run plan, the expected results. (1.1, 2.1, 2.1, 4.1, 5.1, 7.2)– Ashot Gasparyan /30+15 min/
  • 9:55 GEM and its DAQ system (7.1, 7.2) – Kondo Gnanvo /20+10 min/
  • 10:25 Manpower, data analysis procedure (3, 7.3) – Haiyan Gao /20+10 min/
  • 10:55 Run documentation (8) – Eugene Pasyuk /10+5 min/
  • 11:10 Coffee Break /15 min/
  • 11:25 Discussion /20 min/
  • 11:45 Executive Session /30 min/
  • 12:15 Closeout

[*] - items of the previous committee report covered in the presentation

Documents

Run documentation


Operational procedures

PRad Target

HyCal

PRad GEM

PRad Vacuum Chamber

  • [PRad Vacuum Chamber OSP]
  • [PRad Vacuum Chamber Target Task Hazard Analysis Worksheet]

The review will take place November 12, 2015 at 8:30 am in L102

Agenda

  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout


Final Report

Materials for ERR

Presentations

Documentation